BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a road / highway in Saint Clair, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of June 13, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Scope of Work includes street improvements to Cardwell Street within the City of St. Clair and provides for storm sewer, subgrade preparation, concrete curb and gutter, concrete approaches, pavement, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. The City of St. Clair anticipates issuing notice to proceed in the summer of 2025. .Project and bidding questions shall be conducted exclusively via e-mail. Any questions regarding this project must be submitted to: ttodd@cochraneng.com, by 4:00 pm local time on May 8, 2025. No written questions after this date or any verbal questions will be recognized. This section covers the preparation of existing pavement surfaces for overlay, removal of existing pavement and other miscellaneous items. This work shall consist of the removal and disposal of all existing improvements from the right of way and within the limits of any construction area outside the right of way, except improvements designated or permitted to remain in place or to be removed under other items of work. Removal of improvements shall include, but not be limited to, removing (whether designated for removal or for the preparation for new improvements), or movement if appropriate, of all drainage structures, pavement, surfacing and base courses, curb, gutter, sidewalks, house walks, steps, retaining walls, foundation walls, columns, footings, concrete floors, cisterns, catch basins, uncontaminated storage tanks, manholes, drainage and sewer pipes, water and gas main pipes, signs, mailboxes, planters, fences, scattered or piled bricks, stones, broken masonry, rubbish, debris, outdoor advertising signs, etc., from existing improvements. The plans may not show a complete list of all items to be removed. There may be an undetermined number of abandoned utilities, basement or foundation walls, columns, footings or other improvements encountered. The contractor shall determine the extent of the work to be performed under this item. No additional payment will be made for items not shown on the plans that require removal. The Contractor, acting as an independent contractor, shall faithfully and fully perform the Work described in, and shall do everything required by, the Contract Documents or reasonably inferable therefrom, for the complete construction of the project. The Contractor represents and warrants that he has special skills which qualify him to perform the Work in accordance with the Contract and that he is free to perform all such Work and is not a party to any other agreement, written or oral, the performance of which would prevent or interfere with the performance, in whole or in part, of the Work.

Bid Results

Roads / Highways

$304,243.00

Public - City

Paving, Site Work

28

15

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
79
Bidding Soon
1,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

July 14, 2025

Project location map

Cardwell St, Saint Clair, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.