BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a civil project in Marion, Indiana. Completed plans call for site work for a water / sewer project.

The work for which Proposals are to be received: Marion Utilities Water Treatment PlantLime Field Drainage ImprovementProject The work consists of the construction of approximately 260 feet of 24-inch PVC Storm Sewer Pipe, 1-48" storm manhole, 1-60" storm manhole, and all appurtenances necessary to direct the flow of storm water runoff from the lime field to the existing on-site pumping station as shown on the drawings and as specified. Proposals shall be properly and completely executed on the standard Proposal Form obtainable from the office of the Engineer, with fully executed Non-collusion Affidavit required by the statutes of the State of Indiana. Form 96, Contractors Bid for Public Works, shall accompany all bids as prescribed by the Indiana State Board of Accounts. Each Proposal shall be accompanied by a certified check made payable to the Marion Utility Service Board, or an acceptable bidder's bond by an incorporated surety company in good standing and qualified to do business in the State of Indiana, in an amount of not less than 5% of said bid, said deposit being for the purpose of ensuring the execution of the contract for which said bid is made. Any proposal not accompanied by the above required items may be deemed to be a non-responsive bid by the Owner. No consideration for escalation of prices can be considered, and therefore contractors are advised not to include any such escalation clauses in their proposals for this project. The Contractor to whom work is awarded shall be required to furnish a Performance Bond and a Payment Bond, acceptable to the Marion Utility Service Board in the amount of 100% of the contract price. No bidder may withdraw his Proposal within a period of 60 days following the date set for receiving Proposals. The Utility Service Board reserves the right to retain any and all Proposals for a period of not more than 90 days, and said Proposals shall remain in full force and effect during said time. The Marion Utility Service Board further reserves the right to waive informalities and to award the contract to the lowest and most responsible bidder or bidders, all to the advantage of the Marion Utility Service Board, or to reject all Proposals.

Award

Water / Sewer

$80,878.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
4
Bidding Soon
900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

1540 N Washington St, Marion, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.