Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 29, 2025 at 8:00 PM
Updated May 30, 2025
Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.
CHP Cooling Tower Fans VFD Replacement - Sub Bid The Work Includes Furnish and Install Four (4) New, 200 Hp Variable Frequency Drives, Associated Conduit, Wire and Controls. Remove and Replace One (1) Roof Mounted Exhaust Fan and Controls. Repair Existing Dampers. Re-place Intake Air Filters. Commission System. Housekeeping Concrete Pad. Rigging Equipment to Roof and Through Rough Hatch. Trades Include Hvac, Electrical, Concrete, Controls, Demolition, Painting, Cx. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount in the form of a bid bond in the name of which the Contract for the work is to be executed. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed The Authority reserves the right to reject any sub-bid of any sub-trade where permitted by Section 44E of the above-referenced General Laws. The right is also reserved to waive any informality in or to reject any or all proposals and General Bids. The right is reserved to waive any informality in or reject any or all proposals. Filed sub-bids will be required and taken on the following classes of work: HEATING, VENTILATING, AND AIR-CONDITIONING $95,000 ELECTRICAL $1,040,000
Bid Results
Transportation Terminals
$141,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2025
August 4, 2025
To Be Determined, Boston, MA
Related To This Project
Boston, MA
Bid Date: May 07 2025
Boston, MA
Bid Date: Jun 11 2025
Boston, MA
Bid Date: May 15 2025
Boston, MA
Bid Date: Mar 17 2021
Boston, MA
Bid Date: Jun 16 2025
Boston, MA
Bid Date: Sep 18 2025
Boston, MA
Bid Date: May 07 2025
Boston, MA
Bid Date: May 07 2025
Boston, MA
Bid Date: May 08 2025
Boston, MA
Bid Date: May 07 2025
Boston, MA
Bid Date: May 09 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
