Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2026 at 8:00 PM

Updated October 13, 2026

Site work for a water / sewer project in Franklin, West Virginia. Completed plans call for site work for a water / sewer project.

Troublesome Valley Water Extension The method of bidding will be as follows: CONTRACT #1 - Water line Extension Unit price contract to provide and install 2,765 LF of 6" DIP and 8,050 LF of 6" PVC water line; 30 LF of 6" highway boring; 70 LF of steel casing; 9 gate valves; 3 air releases; 2 flushouts; 1 hydroconstant booster station; 1 traditional booster station; 43 anchor walls; and other work required to provide the complete system extension project. CONTRACT #2 - Water Storage Tank Unit price contract to construct one ( 1) water storage tank measuring 14 feet in diameter by 28.5 feet in height to the overflow with a nominal volume of 32,000 gallons, including the foundation, site work, site piping, and telemetry. Contract also includes access road and appurtenances to make a complete operating system . Pre-bid Conference There Will Not Be a Pre-bid Conference for This Project. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Cerrone Associates, Inc., 97-14th Street, Wheeling, WV 26003 - 304-232-5550 Question Deadline 09/17/2026 The following will be added to the Addendum which will be sent out on the 17th: The electric service for both sites will be 480v 3 phase. We are meeting with Potomac Edison onsite this Thursday to clarify the details, which will be added to an addendum. Step down transformation will be needed for the 120/240v requirements. For pump pressures, they were re-checked and updated, the parameters on the drawings are the correct one (710'). The specs will be updated in the addendum. For the boosters, we are open to most possibilities, but both locations have issues. Oak Flat has an adjacent landowner who is fighting the extension. The site's ROW runs through his property so delivery will need to be coordinated and precise. For Fisher Mtn., its halfway up Fisher Mtn. following a logging trail. I highly doubt any prebuilt structure can be delivered to the site. This Bid Will Remain Subject to Acceptance for 90 Days After the Bid Opening, or for Such Longer Period of Time That Bidder May Agree to in Writing Upon Request of Owner. Instructions to Bidders.

Bid Results

Water / Sewer

$408,828.00

Public - County

Site Work

40

27

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
72
Bidding Soon
955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

November 23, 2026

Project location map

Multiple Locations, Franklin, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed