Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2025 at 8:00 PM
Updated June 25, 2025
Renovation of an educational facility in Haverhill, Massachusetts. Working plans call for the renovation of a educational facility.
**As of June 24, 2025, no bids received. No definite date for the rebid.** Nettle Middle School Elevator Rehabilitation and Upgrades Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The City of Haverhill is seeking bids from DCAMM Prime certified Elevator contractors to Rehabilitate and Upgrade the Elevator at the Nettle Middle School located at 150 Boardman Street (128-P-278 / H17504). B. General Scope of Work includes the provision of all labor and materials to perform the following: 1. Remove and discard the existing hydraulic main elevator controller from the machine room and the floor landing system from the inside hoist way enclosure. 2. Furnish and install one new code compliant non-proprietary hydraulic elevator microprocessor based programmable controller, equipped with on-board diagnostics, integrated user interface and solid-state soft start feature. The main elevator control must be engineered and designed for hydraulic simplex operation and future capability for fire services operation and ADA signal control. 3. Replace the existing car operating panel with an ADA compatible stainless steel one containing a bank of mechanical, illuminated buttons marked to correspond to landings served, an emergency call button, emergency stop button, door open and close buttons and a light switch. The emergency call button shall be connected to a bell that serves as an emergency signal. 4. Furnish and install new floor landing system/positioning system located in the hoist way with car mounted electronic reader that transmits exact positioning of car to main controller, improving approach, landing zone transition, leveling sequence, and position accuracy. 5. Furnish and install new car and hoist way wiring with multiconductor care traveling cable and strain relief hardware. 6. Furnish and install new hoist way travel and access limit switches. 7. Remove existing and install extended surface mounted hall buttons at each landing. Faceplates shall be stainless steel. Buttons will coincide with terminal landings and intermittent landings. 8. Clean hoist way, rails, and pump excess liquid out. 9. Check to ensure there is no leakage from the main piston seal. 10. Top off hydraulic fluid as needed. 11. As an alternate, price replacing piston main seal and packing. Questions concerning this bid may be submitted by email to Steven Bucuzzo, Purchasing Director at purcahsing@haverhillma.gov before 4:00 PM on Friday, May 2, 2025.
Final Planning
Educational
$120,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
December 10, 2025
150 Boardman St, Haverhill, MA
Related To This Project
Haverhill, MA
Bid Date: May 28 2025
Haverhill, MA
Bid Date: May 23 2025
Haverhill, MA
Bid Date: May 21 2025
Haverhill, MA
Bid Date: Jun 25 2025
Haverhill, MA
Bid Date: May 29 2025
Haverhill, MA
Bid Date: Jun 26 2025
Haverhill, MA
Bid Date: Jun 23 2025
Haverhill, MA
Bid Date: Jul 02 2025
Haverhill, MA
Bid Date: Jun 11 2025
Haverhill, MA
Bid Date: May 14 2025
Haverhill, MA
Bid Date: Apr 10 2025
Haverhill, MA
Bid Date: Apr 25 2025
Haverhill, MA
Bid Date: Apr 17 2025
Haverhill, MA
Bid Date: Apr 18 2025
Haverhill, MA
Bid Date: May 02 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
