Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated June 19, 2025
Site work and paving for a civil project in North Salt Lake, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
**As of June 17,2025, the project was awarded to Black Forest Paving, with an awarded amount of $1,402.481.47 .** Coventry & Freedom Storm Drain, Water Line & Street Resurfacing Project The Bidder shall indicate the Construction Contract title, the name and address of the Bidder, and the date and time of the Bid opening. The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the above described project as included in the Contract Documents; consisting of the following items of work: approximately 1,855 LF of new 8" culinary water line and new residential services including meter boxes and setters for existing homes; installation of 2 culinary PRV's (provided by City), and 2050 LF of new storm drain pipe, excavation of 7,100 SY of existing road, installation of new asphalt, replacement of monuments, and installation of new collars for all water valves and manholes; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. Project consists of approximately 1,855 LF of new 7" culinary PVC water line and new residential services; installation of two new culinary PRV vaults (vaults provided by City), and 2,050 LF of new storm drain pipe. Removal of all existing asphalt, finish grading of road, and 3" of new asphalt. Approximately 7,100 SY of asphalt. Contact Person: Amy Bean-Cook. P.E. Wilson & Company amy.bean@wilsonco.com 801-307-2860 Bids must be accompanied by a Bid Bond, Certified Check or Cashier's Check in the amount of 5% of the maximum bid price, drawn payable to the order of North Salt Lake City. Bid Security will be returned to each unsuccessful Bidder. All Bids submitted shall be in conformance with the Instructions to Bidders, which are included in the Contract Documents; and shall be guaranteed by the Bidder for a period of sixty (60) days from the date of the Bid opening. The OWNER reserves the right to reject any or all bids presented or to waive any informality in a bid and to make award in the best interest of the City. Question Deadline 05/06/2025 All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation, the Bidder shall comply with the intent and terms of the Contract Documents. Substantial Completion of the Work shall occur 90 (ninety) calendar days after the date of the Notice to Proceed. Any time specified in work sequences in the Summary of Work shall be a part of the Contract Time. 1. OWNER anticipates the two (2) PRVs will be delivered mid-July. Project start date is flexible. The OWNER anticipates that a Notice to Proceed will be given in the following date range, but reserves the right to change such date: Anticipated date of Notice to Proceed: Between June 1, 2025 and July 15, 2025
Award
Water / Sewer
$1,402,481.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
June 1, 2025
Multiple Locations, North Salt Lake, UT
Related To This Project
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
Bid Date: Apr 27 2021
North Salt Lake, UT
Bid Date: Mar 19 2026
North Salt Lake, UT
Bid Date: Apr 03 2026
North Salt Lake, UT
Bid Date: May 14 2025
North Salt Lake, UT
Bid Date: May 13 2025
North Salt Lake, UT
Bid Date: Mar 26 2025
North Salt Lake, UT
--
North Salt Lake, UT
Bid Date: Jan 07 2025
North Salt Lake, UT
Bid Date: Dec 19 2024
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
