Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Site work and paving for a road / highway in Ottawa, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Project consists of constructing Asphalt Street Rehabilitation, consisting of the following approximate major quantities of work: 1. Milling (2" deep) 7,389 S.Y. 2. HMA (Comm. Gr. Cl. A)(in place) 844 Tons 3. Traffic Control 1 L.S. Any questions regarding the project, plans, specifications or bid documents should be directed to David Hamby, City Engineer at (785) 727-7278. Except where specifically noted in these documents, all materials and work shall conform to the "Standard Specifications for State Road and Bridge Construction", Kansas Department of Transportation, latest edition. The scope of the project is detailed in the PROPOSAL forms (attached). Prior to placing any leveling or surface course of asphalt, the Contractor shall apply a tack coat to the pavement surface. The tack coat shall be an emulsified asphalt (SS-1H) applied at a rate of .03 to .05 gallons per square yard, the cost for which shall be incorporated in the asphalt unit price. The mix design for the surface course (entire project) shall be KDOT HMA-Commerical Grade 12.5A (Class A). The contractor may use virgin materials or a blend of virgin materials in combination with a maximum of 15% reclaimed asphalt pavement (RAP). The use of recycled roofing materials will not be permitted in asphaltic pavement mixes. The asphalt cement (AC) shall be PG 64-22. See KDOT specifications and special provisions for any questions. Any other mix design must be preapproved, with a mix design submitted no later than the pre-construction conference. A laboratory mix design shall be submitted for approval. The Contractor shall take care during laying of the surface course to maintain drainage from the finished surface. Any areas on the finished surface which do not drain shall be corrected by removal/replacement at the Contractor's expense. The Contractor shall be responsible to remove all materials, rubbish, debris and waste material resulting from this operation. The Contractor shall conduct the project so as to interfere as little as possible with public traffic, whether vehicular or pedestrian. Legally established standards in the Manual for Uniform Traffic Control Devices (MUTCD) shall be employed by the Contractor. This includes, but is not limited to barricades, signs, flashers and flagmen as appropriate for the work zone. For those projects which include milling, the surface lift of asphalt shall be in placed not later than 30 days after milling. The project shall be complete no later than August 31, 2025. The Notice to Proceed is anticipated to be issued on June 2, 2025. Should the project not be complete by that time, liquidated damages in the amount of $500 per day shall be assessed for each calendar day after that date until the project is complete.
Bid Results
Roads / Highways
$109,873.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 2, 2025
Multiple Locations, Ottawa, KS
Related To This Project
Ottawa, KS
Bid Date: May 08 2025
Ottawa, KS
Bid Date: May 22 2025
Ottawa, KS
Bid Date: Aug 27 2025
Ottawa, KS
Bid Date: Oct 28 2025
Ottawa, KS
Bid Date: Nov 25 2025
Ottawa, KS
Bid Date: Apr 23 2025
Ottawa, KS
Bid Date: May 01 2025
Ottawa, KS
Bid Date: Apr 30 2025
Ottawa, KS
Bid Date: Apr 16 2025
Ottawa, KS
Bid Date: Mar 06 2025
Ottawa, KS
Bid Date: Mar 11 2025
Ottawa, KS
Bid Date: Feb 14 2025
Ottawa, KS
Bid Date: Dec 06 2024
Ottawa, KS
Bid Date: Apr 06 2021
Ottawa, KS
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
