BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated April 1, 2026

Renovation of a power facility in Fergus Falls, Minnesota. Completed plans call for the renovation of a power facility.

Municipal Solar Design, Equipment, and Installation for multiple locations. Question Deadline 03/17/2026 Requests for additional information, clarifications, interpretations, or questions shall be promptly asked via online portal. LCSC is seeking proposals from qualified suppliers that are capable of designing, engineering, installing, and maintaining solar installations on multiple municipal properties located within west central Minnesota. LCSC is seeking proposals from qualified suppliers that are capable of designing, engineering, installing, and maintaining solar installations on multiple municipal properties located within west central Minnesota. Participating municipalities include Audubon, Brandon, Chokio, Otttertail, Rothsay, Underwood, Callaway, Hitterdal, Battle Lake, Parkers Prairie, Vergas, Hoffman, and New York Mills. Successful proposals will allow participating municipalities to purchase solar arrays directly from a supplier, for one or more locations within their county(ies). A description of site locations with project specifications can be found in Attachment 1 - Project Site Details. Through a cooperative RFP process, LCSC and participating municipalities are looking for the best proposal based on the evaluation criteria stated within this RFP. The participating municipalities have been divided into two zones (Zone 1, Zone 2). As such, LCSC and the participating municipalities intend to award this RFP to a single supplier per zone based on the evaluation criteria outlined in this RFP. Zone 1 cities include the following: Audubon, Callaway, Hitterdal, Rothsay, Vergas, New York Mills, and Ottertail. , y y Zone 2 cities include the following: Underwood, Battle Lake, Parkers Prairie, Brandon, Hoffman, and Chokio. LCSC encourages providers of all manufacturers/brands to respond, provided the following criteria are met: _ Competitive pricing _ Warranty protection is available/provided when applicable _ Training and support when applicable _ Turn-key solutions are provided, from design to installation and on-going monitoring and maintenance, as needed Suppliers who meet the above-mentioned criteria must complete all required documents to be considered a responsive and responsible Supplier. An attempt has been made to standardize the language used in this solicitation. The words "must," "shall," "mandatory" and the phrase "it is required" are used in connection with a mandatory specification. The words "should" and "may" are used in connection with a specification that is desirable

Post-Bid

Solar Power Generation

$250,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

33

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
33
Bidding Soon
414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

July 1, 2026

Project location map

Multiple Locations, Fergus Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.