BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Demolition, site work, paving and new construction of a mixed-use development in Fergus Falls, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

The Minnesota Department of Transportation will reconstruct the Highway 210 west junction with Interstate 94 in Fergus Falls. The project is currently scheduled for construction in 2026. As part of this project, the existing bridges will be replaced. MnDOT will replace the existing two bridges with a single structure. With the bridge replacement, the roadway will reduce from four lanes to two lanes, with trails constructed on both sides of the road for pedestrian and bicycle use. Roundabouts will be constructed at the interchange ramps and Redwood Lane. The I-94 eastbound on-ramp and westbound off-ramp will also be realigned to follow the adjusted roadway. At the westbound off-ramp, the tie in will allow for a flatter approach. At the eastbound on-ramp, the ramp will be realigned for easier merging. Project elements Replace bridges Reconstruct interchange ramps Realignment of western ramps Improve bicycle and pedestrian access Construct three roundabouts As of July 28, 2025,The project is include in the State's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$17,300,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

MN-210 and I-94, Fergus Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.