Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Demolition, site work, paving and new construction of a mixed-use development in Fergus Falls, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
The Minnesota Department of Transportation will reconstruct the Highway 210 west junction with Interstate 94 in Fergus Falls. The project is currently scheduled for construction in 2026. As part of this project, the existing bridges will be replaced. MnDOT will replace the existing two bridges with a single structure. With the bridge replacement, the roadway will reduce from four lanes to two lanes, with trails constructed on both sides of the road for pedestrian and bicycle use. Roundabouts will be constructed at the interchange ramps and Redwood Lane. The I-94 eastbound on-ramp and westbound off-ramp will also be realigned to follow the adjusted roadway. At the westbound off-ramp, the tie in will allow for a flatter approach. At the eastbound on-ramp, the ramp will be realigned for easier merging. Project elements Replace bridges Reconstruct interchange ramps Realignment of western ramps Improve bicycle and pedestrian access Construct three roundabouts As of July 28, 2025,The project is include in the State's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$17,300,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
MN-210 and I-94, Fergus Falls, MN
Related To This Project
Fergus Falls, MN
Bid Date: Sep 03 2025
Fergus Falls, MN
Bid Date: Sep 03 2025
Fergus Falls, MN
--
Fergus Falls, MN
Bid Date: Oct 02 2025
Fergus Falls, MN
Bid Date: Nov 25 2025
Fergus Falls, MN
Bid Date: Nov 24 2025
Fergus Falls, MN
Bid Date: Nov 25 2025
Fergus Falls, MN
--
Fergus Falls, MN
Bid Date: Jun 24 2025
Fergus Falls, MN
Bid Date: Jun 12 2025
Fergus Falls, MN
Bid Date: May 20 2025
Fergus Falls, MN
Bid Date: May 20 2025
Fergus Falls, MN
Bid Date: Jun 12 2025
Fergus Falls, MN
Bid Date: Jun 05 2025
Fergus Falls, MN
Bid Date: May 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
