Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated August 13, 2025
Site work and paving for a mixed-use development in Anniston, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Project Consists of the Construction of 50 New Aggregate Based Rv Pads With Water and Electrical Hookups, Tying to a Previously Graded Roadway. Fine Grading and Clearing/grubbing Will Be Required for the Construction of the New Pads as Well as Erosion Control Measures. Said Cost Represents the Cost of Printing, Reproduction, Handling, and Distribution, Therefore No Refund Will Be Granted. Checks for Bidding Documents Shall Be Payable to gmc. Partial Sets of Bidding Documents Will Not Be Available From the Issuing Office. Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda if Any, Obtained From Sources Other Than the Issuing Office. The Calhoun County Commission is Required to Comply With the Beason-hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 Et Seq. Of Code of Alabama 1975 (Act No. 2011-535), Subsequently All Bidders Are Required to Submit an E-verify Affidavit Stating They Are Enrolled in the E-verify Program and the Entire Associated Memorandum of Understanding. The Owner Reserves the Right to Waive Any Informalities, or to Reject Any or All Bids, and to Award the Contract to the Best and Most Responsible Bidder. In the Event That Bids Exceed the Funds Available, the Owner Reserves the Right to Exercise All or Any Combination of Deleting Sections or Parts Thereof to Bring the Construction Cost Within the Funds Available. All Bidders Shall Submit, Upon Request, a List of Projects "Successfully Completed" in the Last 2 Years, Having the Same Scope of Work and Approximate Construction Cost as Specified in This Project. All Bidders Must Comply With Requirements of the Contractor's Licensing Law of the State of Alabama and Be Certified for the Type of Work on Which the Proposal is Submitted. Each Bidder Must Deposit With His Bid, Security in the Amount, Form and Subject to the Conditions Provided in the Instructions to Bidders. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975, and Must Show Evidence of License Before Bidding or Bid Will Not Be Received or Considered by the Engineer; the Bidder Shall Show Such Evidence by Clearly Displaying the License Number on the Outside of the Envelope in Which the Proposal is Delivered.
Post-Bid
Sidewalks / Parking Lot
$300,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
September 8, 2025
Multiple Locations, Anniston, AL
Related To This Project
Anniston, AL
Bid Date: May 30 2025
Anniston, AL
Bid Date: May 21 2025
Anniston, AL
Bid Date: May 21 2025
Anniston, AL
Bid Date: May 21 2025
Anniston, AL
Bid Date: May 20 2025
Anniston, AL
Bid Date: May 28 2025
Anniston, AL
--
Anniston, AL
--
Anniston, AL
Bid Date: May 22 2025
Anniston, AL
Bid Date: Apr 30 2025
Anniston, AL
Bid Date: Apr 04 2025
Anniston, AL
Bid Date: Mar 26 2025
Anniston, AL
Bid Date: Apr 01 2025
Anniston, AL
Bid Date: Apr 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
