Renovation of a civil project in Augusta, Georgia. Completed plans call for the renovation of a water / sewer project.

Augusta is seeking bids for materials and service for upgrading the control of our Standby Generators at our surface water plants (2) and raw water pumping station (1) Augusta Utilities Department. Your submittal should respond to, and be based on, the information included in this Invitation to Bid. All questions must be submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the Procurement Department by Wednesday, May 21, 2025 @ 5:00 P.M. No Bid will be accepted by fax or email, all must be received by mail or hand delivered. To ensure timely deliveries, all submittals must be received during our normal office hours from 8:30 a.m. to 5:00 p.m., Monday through Friday. No deliveries will be accepted prior to 8:30 a.m. or after 5:00 p.m., as the building is closed to the public and delivery services outside of these hours. The work covered by this section is listed per location by the specifications. Highland Water Treatment Plant 2 - Annunciator Panel mounted with Enclosure (RS485) Upgrade 3200 60L to 3300 PTC Controls and add engine ECM Integrate into the existing MV switchgear to provide Close Soft Ramping Single trans-fer pair Provide rs485 to Modbus TCPIP device for monitoring Genset and PTC points Remote Genset HMI in Switchgear Door Additional Conduits, 2 each (1 for AC Utility Metering & 1 For Utility Breaker controls) Adder to Provide 15 Touchscreen, Compact PLC for Additional SCADA, like what HAWTP has now Pull in new Belden cable to replace existing Lonmaker Cable Cummins Parts: A066R260Upgrade Kit, (2)AUX101, (2)AUX102, A041J589 Remote HMI, MCM320 Save and provide all programming performed for customer on thumb drive Service - start-up & testing Tobacco Road WTP Augusta 3.3 Kit and Cummins Parts Upgrade 3200 60L to 3300 Controls and add engine ECM Integrate into the DMC to operate as today Upgrade the Quantum PLC to M340 and change the Sequence of Operation to Main-Tie-Main to close across in a single Utility Failure and return (Includes the 2-MCM3320 devices) This will also add 2 MCM3320s into the system for both UMs , Sync, AC Metering and Soft Ramping Controls. Pull in new Belden cable to replace existing Lonmaker Cable 2 - MCM3320 A066R260 Save and provide all programming performed for customer on thumb drive Service - start-up & testing Augusta Raw Water PS 2 - Annunciator-Panel Mounted With Enclosure (RS485) A041J589 Remote HMI A040H852 3.3 Conversion kit Integrate 3300 PTC 3300 to Operate soft ramping single transfer pair Upgrade K50 Hydro-mechanical 3100 to 3300 Remote Genset HMi in DMC door Provide rs485 to Modbus TCPip device for monitoring Genset & PTC points Additional conduits, 2 each (1 for AC utility metering & 1 for Utility breaker controls) Pull in new Belden cable to replace existing Lonmaker cable Provide new Schweitzer SEL-751 to replace existing GE750 and Basler BE1-951 protection relays. Program and testing required. Test to ensure relay protection and control programming is correct Test Switchgear DMC controls for proper operation & functionality Save and provide SEL relay database and all programming performed for customer Service - start-up & testing

Bid Results

Water / Sewer

$773,335.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
54
Bidding Soon
739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

Multiple Locations, Augusta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.