Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated May 6, 2025
Site work for a bridge / tunnel in Sterling, Colorado. Completed plans call for site work for a bridge / tunnel.
Pre-cast Box Culverts Installation - Logan County Concrete Pre-cast Box Culvert to be purchased and installed by a certified firm licensed to perform work in Colorado and comply with all applicable standards for highway construction All poured in place concrete per plans and specifications. Poured in place concrete shall have a minimum compression strength of 4500 pounds based on a 28-day test result. (Type BDP mix or equal) Rebar to be epoxy coated. 4. Sheet piling to be 7 gauge galvanized, 5 feet in depth, Backfill - Class #1 backfill to be used on side and top of box culvert. Compaction is required to avoid settling. Six inches of class 6 road base used under asphalt. The asphalt pavement has a depth of five inches, installed in two lifts with a minimum of six hours between lifts. Traffic control is the responsibility of the contractor. 8. The Vans Way Acre project requires bypass roads for local residents. 9. County Road 43.5 can be closed during construction. 10. Existing structures to be removed by contractor and disposed of offsite. 11. Soil Stabilization - if soil is not adequate to support concrete culvert it may require overexcavation and installing approved rock to stabilize the soil. This work will be paid for as a change order to the contractor. 12.The precast box culvert to be ordered with rebar exposed on both ends (top and sides) to connect poured in place wing walls and must meet ASTM C1577 standards. A performance and payment bond in an amount of at least 50% of the total contract price will be required. (1) Vansway Drive in the Springdale Irrigation Canal. The estimate should include installing a bypass road and removal of existing culvert. Installing sheet piling on both ends and a new 45' long, 6' x 10' inside dimension pre-cast concrete box culvert with concrete wing walls installed on both ends. Logan County will supply backfill material. (2) County Road 43.5 approximately 1/4 mile north of County Road 36. The estimate should include removal of asphalt and existing culvert. Installing sheet piling on both ends and a new 45' long, 8' x 10' inside dimension precast concrete box culvert with concrete wing walls installed on both ends. Logan County will supply backfill material and road closure The Logan County Board of County Commissioners reserves the right to accept or reject any or all Bids, to waive any informalities in the Bids and to make an award in any manner, consistent with the law, deemed in the best interest of Logan County. Please contact Mike Burri Logan County Road & Bridge Manager for details at 970-520-6370. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.
Post-Bid
Bridges / Tunnels
$300,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
Vansway Dr, Sterling, CO
Related To This Project
Sterling, CO
Bid Date: May 19 2025
Sterling, CO
Bid Date: Jun 18 2025
Sterling, CO
Bid Date: Jun 26 2025
Sterling, CO
Bid Date: Jul 09 2025
Sterling, CO
Bid Date: Aug 25 2025
Sterling, CO
Bid Date: Sep 25 2025
Sterling, CO
Bid Date: Sep 09 2025
Sterling, CO
Bid Date: Feb 13 2026
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Sterling, CO
Bid Date: May 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
