Site work for a civil project in Broxton, Georgia. Completed plans call for site work for a water / sewer project.
As of June 26, 2025, an award has not yet been made. Per the owner, bid results will not be made available until after the award is announced. No time-frame is available for when this project will be awarded. Any Contractor submitting a bid must be a licensed Utility Contractor by the State of Georgia. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water & Wastewater System Improvements as shown on the construction drawings. In general, Division A: Water System Improvements consists of improvements to the City's two existing chemical feed buildings, minor water system improvements at each site, chemical feed equipment and associated piping, electrical upgrades, telemetry system and all associated measuresshown in the construction plans and specifications. Division B: Wastewater System Improvements consist of improvements to six lift stations to include pump replacement, minor repairs and all associated measures shown in the construction plans and specifications. Time allotted for completion of work is 180 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Prequalification may be required of Bidders prior to the award of contract. At the Owner's request, detailed written evidence such as financial data, bonding capacity, previous experience, present commitments, and other such data may be necessary to assist Owner in determining Contractor's qualifications shall be provided per the Instructions to Bidders contained in the contract documents. All bid forms must be accompanied by a Bid Bond or a certified cashier's check in an amount not less than ten percent (10%) of the amount bid. All bonds shall be by a surety company licensed in Georgia with "A" minimum rating performance and financial strength of at least five (5) timesthe contract price aslisted in the most current publication of "Best's Key Rating Guide Property Liability". The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities and to re-advertise. Solicitation no: W0218-006-01 Scope of work: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water & Wastewater System Improvements as shown on the construction drawings. In general, Division A: Water System Improvements consists ofimprovements to the City’s two existing chemical feed buildings, minor water system improvements at each site, chemical feed equipment and associated piping, electrical upgrades, telemetry system and all associated measures shown in the construction plans and specifications. Division B: Wastewater System Improvements consist of improvements to six lift stations to include pump replacement, minor repairs and all associated measures shown in the construction plans and specifications. Time allotted for completion ofwork is 180 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.
Bid Results
Water / Sewer
$1,208,998.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
Multiple Locations, Broxton, GA
Related To This Project
Broxton, GA
Bid Date: Aug 23 2024
Broxton, GA
Bid Date: Mar 31 2022
Broxton, GA
Bid Date: Mar 31 2022
Broxton, GA
Bid Date: Oct 13 2022
Jefferson, GA
Bid Date: Jun 05 2025
Dahlonega, GA
Bid Date: May 29 2025
Atlanta, GA
--
Decatur, GA
Bid Date: May 14 2025
Lawrenceville, GA
Bid Date: May 15 2025
Kennesaw, GA
Bid Date: May 13 2025
Atlanta, GA
Bid Date: May 20 2025
Atlanta, GA
--
Atlanta, GA
--
Decatur, GA
Bid Date: Jun 17 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.