BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a mixed-use development in Whitehall, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

This Partial Design/build Resurfacing Project Includes Milling, Asphalt Overlay, Flexible Base Replacement, Design/build Ada Curb Ramps, Loop Sensors, Guide Rail Removal, Pavement Markings and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 1015, Section M89, in Lehigh County, Whitehall Township and City of Allentown From Segment 0010 Offset 0000 to Segment 0060 Offset 1806 and Segment 0021 Offset 0000 to Segment 31 Offset 1060 for a Construction Length of 3.01 Miles. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Anticipated NTP: 07/07/2025 Wage Rates: Yes Required Completion: 09/30/2026 Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT: Fullerton Ave Resurface - SR 1015 Description: This partial design/build resurfacing project includes milling, asphalt overlay, flexible base replacement, design/build ADA curb ramps, loop sensors, guide rail removal, pavement markings and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 1015, SECTION M89, in LEHIGH COUNTY, WHITEHALL TOWNSHIP and CITY OF ALLENTOWN from segment 0010 offset 0000 to segment 0060 offset 1806 and segment 0021 offset 0000 to segment 31 offset 1060 for a construction length of 3.01 miles.

Award

Roads / Highways

$1,950,497.00

Public - State/Provincial

Paving, Site Work

15

8

2

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
704
Active Projects
341
Bidding Soon
4,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

July 7, 2025

Project location map

State Rte 1015, Whitehall, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.