Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 1, 2025 at 8:00 PM
Updated May 8, 2025
Renovation of a residential development in Onamia, Minnesota. Completed plans call for the renovation of a residential development.
Work Scope Description: Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book. Demo and remove existing Walk-In tub. (walk-in tub will not be re-used or salvaged). Owner, contractor and or any other party may not keep and contractor should render the tub un-useable. The proper disposal to landfill should be included. Supply and install Flexstone Royale Alcove Shower Surround. Include supply and install of 2 15 in. corner shelves. Supply and install Flexstone single threshold shower base with correct sided drain opening. The Surround and component colors to be coordinated by General Contractor and selected by Elder Homeowner. Contractor shall include all materials and labor necessary for installation per manufacturers instructions, including but not limited to the shower drain and backer boards for walls. Contractor is responsible for field measuring while ensuring that new shower assembly complete fits in the opening. Complete re-do of flooring, sub-floor and base throughout entire bathroom. Seams and edges to be fitted tight and sealed with proper silicone or sealants approved for bathroom wet conditions. Use 10 mil residential vinyl sheet flooring. Color selected by Elder homeowner. The sheetrock walls above the shower surround panels to the ceiling must be smooth and painted with Zinsser mold killing primer first and then a semi-gloss paint. The top edge of the shower surround must be sealed tight at the sheetrock edge. Contractor shall include all costs associated with moving plumbing to align with the new showers heads. Provide (2) shower heads; (1) fixed position over sized shower head and (2) Is a shower head on a wall bar with wand. Contractor shall include all costs associated with adjusting the opening to fit the new shower. Shower shall fit without leaving a gap in the flooring at shower edge. Proper water proof sealant and installation to seal between the floor and shower enclosure. Existing toilet will receive new wax ring. Pull the toilet and res-install with new wax ring. Supply and install CSI Bathware 26w 15 wall mounted folding shower seat. Supply and install grab bars per MN Accessibility Code. Replace existing tub valve assembly to eliminate tub spout as new will be shower function only. Remove all faucets and water supply that serviced current walk-in tub. Install Moen handheld showerhead combo with both fixed position shower head and slide bar (Moen T8342CBN) chrome finish. Include all piping necessary to complete shower installations. Patch, tape and texture drywall around the new shower enclosure as needed, including any adjustment for difference in shower sizing; prime and paint all affected drywall surfaces in the bathroom. Sand any existing drywall areas of texture or seams which do not blend-in well. All (new and existing) texturing to match as closely as possible. Prime all drywall with Zinsser mold killing primer. Repaint all drywall surfaces, walls and ceiling with Dover White. When complete, the expectation is that all the paint and texturing looks as uniform as possible. Demo and replace all smoke detectors with spec combo smoke c/o detectors as needed to meet code compliance. Elder homeowner to provide shower curtain and rod. Remove and replace existing bathroom exhaust fan with Spec. Book Panasonic type. The Elder homeowner does not have a second shower or tub. General Contractor will schedule for the least amount of interruption as possible. The Elder homeowner does have a second toilet on another level for during the project. Contractor shall include 0.5% TERO tax fee in base bid. Submission of receipt for paid TERO fee is required with application for final payment. Permit through MLBO. Be sure to figure permit fee according to the updated fee schedule. Contact Jackie Smith at 320-384-4773 or via email to: JSmith2@grcasinos.com with questions regarding licensing and for the license application Project will be substantially complete within 180 days of fully executed contract. For all Band funded residential construction projects, a performance bond is required for contracts in excess of $100,000.0 **The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time,
Post-Bid
Residential Subdivision
$217,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2025
June 9, 2025
105 Birch St, Onamia, MN
Related To This Project
Onamia, MN
Bid Date: Jun 04 2025
Onamia, MN
Bid Date: Jun 11 2025
Onamia, MN
Bid Date: Jun 24 2025
Onamia, MN
Bid Date: Aug 13 2025
Onamia, MN
Bid Date: Aug 11 2025
Onamia, MN
Bid Date: Apr 10 2025
Onamia, MN
Bid Date: Feb 19 2025
Onamia, MN
Bid Date: Feb 19 2025
Onamia, MN
Bid Date: Dec 18 2024
Onamia, MN
Bid Date: Dec 11 2024
Onamia, MN
Bid Date: Oct 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
