Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Site work and paving for a road / highway in Union, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
There will be no required Pre-Bid Meeting. DESCRIPTION OF WORK: The project is officially known as "Town of Union Swamp Road 2025 - ARIP #00009". The project is described as pulverizing and repaving a +-1.5mile portion of Swamp Road (from County Road Y to the border of the Town of Brussels) in the Town of Union, Door County, WI. This project is partially funded by the WI DOT Agricultural Roads Improvement Program (ARIP). In general, work consists of the following: Pulverization, reconstruction, re-pavement, and culvert installation on the Town-owned roadway. This project will be bid simultaneously as the reconstruction project for the Town of Brussels owned, easterly, portion of Swamp Road. Bids, contracts, and payments will be run independently of each other; however, the intent is to complete the work in unison. The Town reserves the right to reject any and all bids, the right to waive irregularities and informalities in bidding, the right to disregard all nonconforming, nonresponsive, unbalanced or conditional bids, and the right to accept the bid which best serves the interests of the Town.. : The bidder to whom a Contract is awarded shall furnish a Performance Bond for the full amount of the Contract within 10 days of award or execution of the Contract. The Performance Bond shall contain a provision to increase the Performance Bond by the amount of any change orders that might increase the amount of the Contract price. If such bidder fails to execute and file such a Performance Bond within the 10-day period, the check, bond, or bank draft accompanying the bid shall be forfeited to the Town as liquidated damages. The Town reserves the right to postpone the award of the contract, and no bids shall be withdrawn for a period not exceeding 60 days after the date and time set forth in the Bid Opening. The Town reserves the right to retain the bid security of the three (3) lowest bidders during that time.
Bid Results
Roads / Highways
$403,758.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2025
June 11, 2025
Swamp Rd, Union, WI
Related To This Project
Union, WI
Bid Date: Jul 23 2025
Union, WI
--
Union, WI
Bid Date: May 01 2025
Union, WI
Bid Date: Aug 19 2024
Union, WI
Bid Date: Mar 17 2022
Union, WI
Bid Date: May 31 2023
Union, WI
Bid Date: Jul 05 2023
Union, WI
Bid Date: May 23 2022
Oshkosh, WI
Bid Date: May 19 2025
Milwaukee, WI
--
Milwaukee, WI
--
La Crosse, WI
Bid Date: May 01 2025
Columbus, WI
Bid Date: May 27 2025
Weston, WI
Bid Date: May 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
