Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
Site work and paving for a road / highway in Fond du Lac, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of July 3, 2025. Project were awarded to: - Northeast Asphalt Pulverize, Grade and Compact Pave 2" Binder 1-1/2" Finish Coat Cody Road (2,000 West of Tower Road) Mill and Shape 3.5" of Asphalt Pave 2" Binder with 1-1/2" Finish Coat Bittersweet Lane (Lakeview Road East) Pulverize, Grade and Compact Pave 2" Binder with 1-1/2" Finish Coat Billene Drive (End of curb North) 1-1/2" Overlay Meadowview Drive (Lakeview Rd to Bittersweet Lane) -Scott's Construction Cold Mix, Wedge Overlay, Chip Seal with Black Granite Slag Tower Road (Golf Course Drive to North) Chip Seal with Black Granite Slag Golf Course Drive (County UU to Taft Road) . Ledge Road (Seven Hills to Konen Road) -Thunder Road Crack Fill Silica Road (Hwy QQ to Tower Road) Ravenview Court (Golf Course Drive to end) Fishermans Road (Hwy 151 to end) Bluegill Drive (Mallard Lane to end) Taynette Circle (Billene Drive to Bellene Drive) Schuster Lane (East and West of Billene Drive) Fairfield Drive, Fairlane Circle, Linden Drive, Linden Court (entire subdivision) Additional patching on Ledge Rd and center line stripping but awarded amount is not available. Sealed bids are requested for the following street improvement projects in the Town of Taycheedah: Pulverize, Grade and Compact Gravel Lift Pave 2" Binder with 1.5" Finish Coat 1. Cody Road 2,000' West of Tower Road Approximately 400' * 20' LRIP Grant Remove 3.5" of Asphalt Pave 2" Binder with 1.5 ^ prime prime Finish Coat 2. Bittersweet Lane Lakeview Road East Approximately 700' * 20' Pulverize, Grade and Compact Pave 2" Binder with 1.5 ^ prime prime Finish Coat 3. Billene Drive End of curb North Approximately 380 y' * 20' 1.5 ^ prime prime Overlay 4. Meadow Drive Lakeview Rd to Bittersweet Lane Approximately 300 deg * 20 deg Cold Mix, Wedge Overlay, Chipseal with Black Granite Slag 5. Tower Road Golf Course Drive to North Approximately 4,200' x 20' Chipseal with Black Granite Slag 6. Golf Course Drive County Hwy UU to Taft Road Approximately 5,680' x 20' 7. Ledge Road Seven Hills to Konen Road Approximately 5,240' x 20 Crackfill 8. Golf Course Drive County UU to Taft Road 9. Ledge Road Seven Hills to Konen Road 10. Silica Road Hwy QQ to Tower Road 11. Ravenview Ct Golf Course Drive to End 12. Fishermans Road Hwy 151 to End 13. Bluegill Drive Mallard Lane to End 14. Taynette Circle Billene Drive to Billene Drive 15. Glenn Street Hwy WH to Billene Drive Badger Lane 16. Schuster Lane East and West of Billene Drive 17. Fairfield Drive McCabe Road to Fineview Fairlane Circle (entire subdivision) Linden Drive Linden Court Blacktopping shall be in accordance with the State of Wisconsin Standard Specifications for Road and Bridge Construction. Bids must be accompanied by a certificate of Workman's Compensation and Liability Insurance. Bidders are advised that the Town of Taycheedah reserves the right to reject bids not deemed in the best interest of the Town. Contact Justin at 920-238-0674 with any questions or if more information is needed.
Award
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2025
July 7, 2025
Multiple Locations, Fond du Lac, WI
Related To This Project
Fond du Lac, WI
Bid Date: May 29 2025
Fond du Lac, WI
Bid Date: Jun 05 2025
Fond du Lac, WI
--
Fond du Lac, WI
--
Fond du Lac, WI
--
Fond du Lac, WI
Bid Date: May 15 2025
Fond du Lac, WI
--
Fond du Lac, WI
--
Fond du Lac, WI
Bid Date: May 08 2025
Fond du Lac, WI
Bid Date: Apr 29 2025
Fond du Lac, WI
Bid Date: Apr 17 2025
Fond du Lac, WI
Bid Date: Apr 29 2025
Fond du Lac, WI
Bid Date: Apr 08 2025
Fond du Lac, WI
Bid Date: Apr 22 2025
Fond du Lac, WI
Bid Date: Apr 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
