Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated September 12, 2025
Site work and paving for a road / highway in Fond du Lac, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of June 06, 2025. Project were awarded to Northeast Asphalt in the amount of $187, 936.80 Northeast Asphalt in the amount of $187, 936.80. And Scott Construction in the amount of $105,816 for: Millpond Rd (Y to F); Hickory Rd. (Y to F); Oaklane Rd. (Y to town line); Church Rd. (Hwy 175 East to cul de sac); Lost Arrow Rd. (Hwy 175 to Kelly Rd.) Total awarded bid: $293,752.80 Cold Mix Paver Wedging & Overlay | Hot Oil Seal Coating 1- Millpond Rd. ('Y' to 'F') Total Length (1.50 mi.) X 21ft. Apply a single hot oil chip seal coat application using F2 1/8" granite black stone chips 2- Kelly Rd. (F to East Fondy Rd. joint) 11,525ft. (2.18 miles) X 21ft. Apply a single hot oil chip seal coat application using F2 1/8" granite black stone chips 3- Hickory Rd. ('Y' to 'F') 7,950ft. (1.50 miles) X 21-22ft. Apply a single hot oil chip seal coat application using F2 1/8 granite black stone chips 4- Oaklane Rd. ('Y' to County Line) * 2,680ft. (.50 miles) X 21-22ft. Apply a single hot oil chip seal coat application using F2 1/8" granite black stone chips 5- Kenyon Rd. ('D' to River Rd.) 8,130ft. (1.55 miles) X 21-22ft. Apply a single hot oil chip seal coat application using F2 1/8" granite black stone chips "Needs crack fill prior to seal coat 6- Church Rd. (Hickory Rd. to Hwy. 175) 750ft. X 30ft., 7,250ft. X 21ft. (1.52) miles) X 21- 30ft. Apply a single hot oil chip seal coat application using F2 1/8 granite black stone chips 7- Lost Arrow Rd. (Hickory Rd. to KellyRd.) Potential seal coat projects tying all cold mix wedges together with existing surface. For further information, contact Dustin Westphal at W6209 West Byron Road, Brownsville, WI 53006 Phone 920-960-8186
Award
Roads / Highways
$294,753.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 8, 2025
Multiple Locations, Fond du Lac, WI
Related To This Project
Fond du Lac, WI
Bid Date: Apr 29 2025
Fond du Lac, WI
Bid Date: Apr 17 2025
Fond du Lac, WI
Bid Date: Apr 29 2025
Fond du Lac, WI
Bid Date: May 08 2025
Fond du Lac, WI
Bid Date: May 07 2025
Fond du Lac, WI
Bid Date: May 29 2025
Fond du Lac, WI
Bid Date: Jun 05 2025
Fond du Lac, WI
--
Fond du Lac, WI
Bid Date: Apr 22 2025
Fond du Lac, WI
Bid Date: Apr 04 2025
Fond du Lac, WI
Bid Date: Aug 21 2025
Fond du Lac, WI
Bid Date: Apr 24 2025
Fond du Lac, WI
Bid Date: Mar 18 2025
Fond du Lac, WI
Bid Date: Apr 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
