BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 4, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a road / highway in Plant City, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Hillsborough Road Name: Sr 39 (James L Redman Pkwy) Limits: At Trapnell Rd Project(s): 44539315201(*) Federal Aid No: D725012B Total Roadway Length: 0.530 Miles Contract Days: 260 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.530 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Description: The Improvements under this Contract consist of milling asphalt pavement and resurfacing with concrete pavement on SR 39 at Trapnell Road in Hillsborough County. Question Deadline 05/21/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Departments budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 021 - Rigid Pavement Construction - James L Redman Pkwy QA - 05/26/2025 : Yes, the final grades will be very close to the existing grades. Refer to the profile and cross sections for final grades; and Temporary Traffic Control General Note 6 for drop-off compliance during construction, and how payment should be addressed if needed

Award

Roads / Highways

$8,023,564.00

Public - State/Provincial

Paving, Site Work

102

7

5

7

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
155
Bidding Soon
2,557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 11, 2025

Project location map

James L Redman Pkwy, Plant City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.