Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 4, 2025 at 8:00 PM
Updated August 19, 2025
Site work and paving for a road / highway in Plant City, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Hillsborough Road Name: Sr 39 (James L Redman Pkwy) Limits: At Trapnell Rd Project(s): 44539315201(*) Federal Aid No: D725012B Total Roadway Length: 0.530 Miles Contract Days: 260 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.530 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Description: The Improvements under this Contract consist of milling asphalt pavement and resurfacing with concrete pavement on SR 39 at Trapnell Road in Hillsborough County. Question Deadline 05/21/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Departments budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 021 - Rigid Pavement Construction - James L Redman Pkwy QA - 05/26/2025 : Yes, the final grades will be very close to the existing grades. Refer to the profile and cross sections for final grades; and Temporary Traffic Control General Note 6 for drop-off compliance during construction, and how payment should be addressed if needed
Award
Roads / Highways
$8,023,564.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
August 11, 2025
James L Redman Pkwy, Plant City, FL
Related To This Project
Plant City, FL
Bid Date: Jun 05 2025
Plant City, FL
--
Plant City, FL
Bid Date: Jul 14 2025
Plant City, FL
Bid Date: Sep 04 2025
Plant City, FL
Bid Date: Nov 13 2025
Plant City, FL
Bid Date: Nov 13 2025
Plant City, FL
Bid Date: Nov 03 2025
Plant City, FL
Bid Date: May 08 2025
Plant City, FL
--
Plant City, FL
--
Plant City, FL
Bid Date: Apr 02 2025
Plant City, FL
Bid Date: Apr 03 2025
Plant City, FL
Bid Date: Apr 30 2025
Plant City, FL
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
