BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and paving for a road / highway in Grand Marais, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of June 2, 2025 this project was awarded to the Following Contractors: 1. Mike Rose Excavating for Evergreen Rd SGSD 2. Jed Smith Excavating & Septic, LLC for Mile-O-Pine SGSD 3. LaBoda Grading, Inc. for Private Arrowhead Trl, Little Ollie, Rosebush Hl, Voyageurs Pt, and West Rosebush Ln SGSD The awarded amount is not available. Summer Maintenance of the Access Road to Caribou Lake for the Evergreen Road Association. Road is Located Approximately 4.5 Miles North of Lutsen, Mn Off Csah 4; Approximate Length is 0.9 Miles. Summer Maintenance of the Access Road to Voyageur's Point for the Voyageur's Point Association. Road is Located Approximately 35 Miles Northwest of Grand Marais Off Cr 85 and is 3,500 Feet in Length. Summer Maintenance of the Access Road to Mile-o-pine Association. Road is Located Approximately 48 Miles Northwest of Grand Marais Off Cr 20 (South Gunflint) and is 1.9 Miles in Length. Summer Maintenance of the Access Road to West Rosebush Lane Association. Road is Located Approximately 3.5 Miles West of Grand Marais Off Th 61; Approximate Length is 2,200 Feet. Summer Maintenance of the Access Road to Rosebush Hill Sgsd. Road is Located Approximately 3.5 Miles West of Grand Marais Off Th 61; Approximately 2,100 Feet in Length. Summer Maintenance of Lima Grade From Csah 12 to Little Ollie Road, and Little Ollie Road From Lima Grade to Its Intersection With Poplar Creek Drive (for the Little Ollie Sgsd), Located Approximately 29 Miles Northwest of Grand Marais Off Csah 12 (Gunflint Trail); Approximately 1.8 Miles in Length Total. Summer Maintenance and Special Services of the Private Arrowhead Trail From Ary Point Road to the West End of the Road, Located Approximately 19 Miles North of Hovland on the Arrowhead Trail; Approximately 1.7 Miles in Length Total. The Board of Commissioners Reserves the Right to Reject Any or All Bids and to Waive Any Irregularities Therein.

Award

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
110
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

Multiple Locations, Grand Marais, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.