BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a water / sewer project in Sunnyvale, Texas. Completed plans call for site work for a water / sewer project.

**As of June 5,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** As set forth in the plans andspecifications the project is designed to perform relocations approximately13,000LF of 8", 12" 16", 24" and 30" of waterline mains, and related work, withinHighway 80 Right of Way, within the town limits of the Town of Sunnyvale. All questionsarerequired to be submitted through online . Phone and email questions will not beresponded to. Bidder must submit, with their Bid, a Cashier's check, Certifiedcheck or a Bid Bond from an approved surety company, in the amount of five percent(5%) of their Bid as a guarantee that the Bidder will enter into a contract andguarantee forms, if required, within 10 days after notice of award of contract. Thesuccessful bidder must furnish both a Performance Bond and a Payment Bond, each inthe amount of 100 percent of the contract price, from an approved Surety companyholding a permit from the State of Texas to act as surety, and acceptable accordingto the latest list of companies holding Certificates of Authority from theSecretary of the Treasury of the United States, or another Surety acceptable to theTown.Further information concerning the procurement may be obtained by email onlyfrom the Town of Sunnyvale Engineering Division - Matthew Holzapfel, P.E., TownEngineer at matthew.holzapfel@townofsunnyvale.org The right is reserved by the Townof Sunnyvale to reject any and all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $5,000,000 - $5,500,000 This project is for the removal and replacement of waterlines and related work along Highway 80 at various locations within TXDOT Right of Way between the east and west limits of the Town of Sunnyvale Should you have any concerns or questions concerning this information or the conduct of any of our employees please contact the Town's manager, Jeff Jones at 972-203-4165. All calls to the Town's manager are confidential and your name (or any other identifying information) will not be disclosed. Jeff Jones, MPA Town Manager

Bid Results

Water / Sewer

$6,428,402.00

Public - City

Site Work

126

24

87

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
45
Bidding Soon
4,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 15, 2025

Project location map

US-80, Sunnyvale, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.