BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work and new construction of a playground / park / athletic field in Boisbriand, Quebec. Design plans call for the construction of a 8,500-square-foot, two-story above grade playground / park / athletic field; and for site work for a playground / park / athletic field.

Upgrades and improvements to Des Berges municipal park. The scope of work includes the construction of a park chalet. TIMELINE: The owner has awarded a full team of architectural and engineering professional consultants to provide design and construction work monitoring services. Preliminary planning is underway. Working drawings are expected to begin in early spring 2026. Timelines of further project development are being finalized.

Design

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
99
Bidding Soon
2,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2027

Project location map

496 Rue Émile-Nelligan, Boisbriand, QC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.