BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a sidewalk / parking lot in Mercer, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot.

seal coating the District's parking lots. The Mercer Area School District is accepting bids for sealcoating District parking lots. The work is to be performed at the Mercer Middle High School, Soccer field and Elementary School. Interested bidders must submit written responses. The District reserves the right to reject any and all bids, or any part of any bid, and to waive technical defects if, in its judgment, the best interest of the District will be served thereby. t is the intent of these specifications to have the Mercer Area School District parking lots sealcoating, crack sealing and strip work completed by July 31, 2025. A. All bids must be summitted using the attach bid submission form. B. Inspection of Premises by Bidders: 1. Bidders are required to completely inspect school district facilities prior to submitting a proposal in order to determine all requirements associated with the contract. 2. Bidders are expected to determine and designate all square footage requirements. 3. Failure to inspect the facilities and determine all square footage requirements and conditions shall not relieve the successful bidder from the necessity, without additional cost to the School District, of performing any labor or providing any materials and equipment that may be required to carry out the intent of the resulting contract in accordance with specifications. C. Sealcoating: 1. Edge and clean ALL asphalt 2. Seal all cracks 3. Apply "Durafil PL (or product equal to)" hot tar to all main cracks 4. Apply "Gator patch" to multiple cracked areas 5. Apply "Petroseal (or product equal to)" to any oil spots as a primer 6. Apply "X-10" (or product equal to) asphalt sealer to asphalt - sealer will be HAND APPLIED with seal brooms NOT SPRAYED 7. Allow 24 hour drying time 8. Apply all stripe work 1-2 days later - after curing 9. Two-year warranty D. Sealer must be mixed with the following: 1. "Tarmax (or product equal to)" for a more durable blacker surface. 2. "TopTuff (or product equal to)" for a non-marking fast drying surface. 5 3. "Silica Sand (or product equal to)" for a non-slip surface 4. If Sealer is cut the minimum ratio will be at least 80% sealer and 20% water E. Locations and estimated square footage: 1. Sealcoating: School Street - from route 318 to football field - 10,000 square footage Mercer Soccer Field Parking Lot -17,200 square footage Mercer Elementary School- Main/Front - 38,640 square footage Mercer Elementary School - New Gym -10,000 square footage Mercer Elementary School - Parent drop off - 2,000 square footage Mercer Elementary School - Teacher overflow - 21,250 square footage 2. Crack sealing: Mercer Middle High School football stadium entrances - 4,400 square footage Mercer Middle High School -School Street to Admin 58,000 square footage Mercer Middle High School - Front/Student 67,000 square footage Sealcoating: School Street - from route 318 to football field Mercer Soccer Field parking lot Mercer Elementary School- Main/Front Mercer Elementary School - New Gym Mercer Elementary School - Parent drop off Mercer Elementary School - Teacher overflow Crack sealing: Mercer Middle High School football stadium entrances Mercer Middle High School -School Street to Admin Mercer Middle High School - Front/Student

Award

Sidewalks / Parking Lot

$24,723.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
120
Bidding Soon
2,022
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Multiple Locations, Mercer, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.