BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work for a water / sewer project in Frenchville, Pennsylvania. Completed plans call for site work for a water / sewer project.

Consists of completing an aquifer pump test on the recently drilled public water supply well and recording manual measurements of the test well water level. The aquifer pump test will consist of 72 hours of operating the well pump at a constant rate and manual monitoring of the test well and manual monitoring during the recovery period of 24 hours minimum, or until water levels have recovered by 95% of the pre-pumping water level. Water quality samples shall also be collected and analyzed during the aquifer pump test. Coordinate with hydrogeologist, engineer, and owner and provide all equipment, materials, and labor necessary to perform pump test, complete manual measurements through all phases, and collect water quality data. This project is being financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. The obligations imposed on the CKGAA by the funding agency shall apply to and be acceptable to the successful bidder. Bidders must comply with all State anti-bid-rigging regulations pertaining to work associated with this project and will be required to submit an executed non-collusion affidavit with the bid. *The bid list for this project may be incomplete. If you are bidding this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Water / Sewer

$450,000.00

Public - State/Provincial

Site Work

10

4

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
96
Bidding Soon
938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 19, 2025

Project location map

Multiple Locations, Frenchville, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.