Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2025 at 8:00 PM
Updated June 17, 2025
Site work and paving for a sidewalk / parking lot in Wayne Township, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**No bids received, Project completed using in house staff** Scope of Work for Concrete Materials Contract The scope of work consists of the following, but is not limited to: 1) Production and delivery of ready-mix concrete to the Project Site. The concrete material is expected to be provided in multiple phases. This includes providing concrete mix designs, material submittals, and other related as required in Specification Section 033000 "Cast In Place Concrete" for Owner Approval. a) Use of "Exposed to Freeze/Thaw Concrete" for foundation walls, exterior slabs-on-grade, sidewalks, and other concrete onsite. Normal-weight concrete. b) Minimum Compressive Strength: 5000 psi at 28 days c) Maximum W/C Ratio: 0.45. d) Slump Limit: 4 inches for concrete with verified slump of 2 to 4 inches plus or minus 1 inch, before adding high-range water-reducing admixture or plasticizing admixture, 8 inches maximum after admixture addition. e) Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/12-inch nominal maximum aggregate size. 2) Materials Contract Total Estimated Quantity: 132 Cubic Yards. Additional fees such as mobilization, demobilization, travel, small load, and all other associated fees shall be included in the Concrete Materials unit pricing. 3) The Owner shall provide a minimum of 7 days lead time to the Contractor for scheduling required services. a) This work requires the use of pumper truck to place the Concrete material. Pumping services are not included in this contract. The Owner will provide the coordination between the pumper truck and concrete materials provider. Delivery Schedule: The Contractor agrees to complete all work contemplated by this contract within 90 Calendar Days of the execution by the Owner
Project Abandoned
Sidewalks / Parking Lot
$70,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 16, 2025
SW Bluff Rd, Wayne Township, MO
Related To This Project
Weldon Spring, MO
Bid Date: May 06 2025
Saint Louis, MO
Bid Date: May 06 2025
Ft Leonard Wd, MO
Bid Date: May 12 2025
Village of Four Seasons, MO
Bid Date: May 13 2025
Wentzville, MO
Bid Date: May 19 2025
Ballwin, MO
--
Salem, MO
Bid Date: Jul 17 2025
Saint Louis, MO
Bid Date: May 21 2025
Jefferson City, MO
Bid Date: Jun 05 2025
Wentzville, MO
--
Florissant, MO
--
Springfield, MO
Bid Date: May 28 2025
Ft Leonard Wd, MO
Bid Date: May 20 2025
Kansas City, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
