Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and new construction of a mixed-use development in Miami, Florida. Completed plans call for the construction of a fire / police facility; fire / police facility; for site work for a road / highway; and sidewalk / parking lot.
The types of contracts available under the MCC Program are construction projects, facility repairs, neighborhood improvements, emergency repairs and maintenance work with a maximum value of $5.0M; ORD 09-101. All capital departments are participating. Additional opportunities are available through Weatherization Assistance Program (WAP) which enables low-income families to reduce their energy bills by making their homes more energy efficient. Funds are used to improve the energy performance of dwellings by families in need, using the most advanced technologies and testing procedures available in the housing industry. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. SCOPE OF WORK: Layout of Work: The work, in general consists of new concrete slabs for a new (2) 8'x20' High Cube Steel Gym Exercise Container's. Also a 3" thick. Insulated Aluminum Covered Screen Enclosure patio area. Including a new proposed Chain-Link Rolling Gate approximately 20'-22'ft long along with the required kantech access keypad for gate control. Contractors provide new Yellow traffic paint striping and parking lot layout, as well as New Accessible Ramp & Stairs for the newly delivered dorm Trailer by others. Contractor to provide All necessary underground utilities such as (Electrical, Water & Sewer) for dorm trailer connections and implementation, see sheets SE-1.0 & SP-1.0. Contractors to field verify all dimensions. Make reference to the project contract drawings consisting of six (6) sheets A- 1.0, 2.0, 3.0, E-0.1, SE-1.0, and SP-1.0. herein prepared in-house by Miami-Dade Fire Rescue, Design & Construction Bureau. Fire Station #39- located at 39 Europe Way, Miami, Fl. 33132, inside the Seaport Island Property. o Contractor to provide labor, material, transportation, and equipment and perform all operations required for the installation of the proposed Steel containers. Contractor to follow the requirements listed on the RPQ and project contract drawings at all times. Contractor is responsible to comply with all requirements, according to the Miscellaneous Construction Contractor. o Contractor to include necessary dumpster as required to comply with the proposed scope of work. o Min. of 5 years manufactures warranty on All products and installation. Solicitation no:FS-39 SITE PLAN IMPROVEMENT
Post-Bid
Fire / Police
$500,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
August 28, 2025
39 Europe Wy, Miami, FL
Related To This Project
Miami, FL
Bid Date: May 01 2019
Miami, FL
--
Miami, FL
Bid Date: Aug 13 2025
Miami, FL
Bid Date: Aug 13 2025
Miami, FL
Bid Date: May 21 2025
Miami, FL
Bid Date: May 30 2025
Miami, FL
Bid Date: Jul 01 2025
Miami, FL
Bid Date: Jun 10 2025
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: May 27 2025
Miami, FL
Bid Date: Jun 24 2025
Miami, FL
Bid Date: May 23 2025
Miami, FL
--
Miami, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
