BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 8, 2025

Site work and paving for a sidewalk / parking lot in Exeter, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Exeter R-VI Board of Education is accepting bids for construction of a covered walkway to the Middle School Building at Exeter Schools. The covered walkway would be a small sidewalk that is between our main structure and a small middle school building. (approx. 15 feet long walkway on a sidewalk) The Board of Education reserves the right to reject any and all bids. Questions may be directed to the Central Office at (417) 835-2922 ext. 5 or email tjordan@exeter.k12.mo.us

Post-Bid

Sidewalks / Parking Lot

$54,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
75
Bidding Soon
922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 6, 2025

Project location map

To Be Determined, Exeter, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.