BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated June 26, 2025

Site work and paving for a sidewalk / parking lot in Upper Arlington, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Maintenance - Grinding & Leveling Question Deadline 05/09/2025 at 8:00 AM ET Deadline for questions, submitted on online. The owner reserves the right to reject any and all bids, to waive any and all informalities, and to disregard all non-conforming responsive or conditional bids. Requirements of the City of Upper Arlington Affirmative Action Program are applicable. Each bidder must insure that all employees and applicants for employment are not discriminated against because of their race, creed, color, sex, sexual orientation, religion, national origin, age, handicap status, or veteran status. The City of Upper Arlington encourages all businesses, including minority and women-owned businesses to respond. The bid for the 4" concrete walkway the contractor shall include a bid price to replace, grind or meander short sections of sidewalk in accordance to the specifications. This sidewalk work is at various locations, as directed, on the streets within this contract. The panels of sidewalk being replaced, leveled, meandered or grinded may be as little as 16 square feet or as large as 25 square feet at each separate location. The panels of sidewalk that need to be meandered to avoid large tree roots will be done as directed by the City Representative. The bid price for per panel of sidewalk for this work shall include all labor, materials and equipment necessary to construct an ADA compliant 4" concrete walkway (6" at driveways), including traffic control, excavation, backfill, grading and any incidental necessary to complete the work noted. Sidewalk panels that have been removed shall be replaced within 7 working days of the removal. All topsoil shall be installed within 7 days after the sidewalk panels have been installed. Any existing obstacles (fire hydrant, guy wire, tree, etc.) that must be relocated or removed by the contractor will be paid for under force account work as outlined in the contract. Also, any retaining wall installation, sprinkler line repairs, dog fence repairs, manhole adjustments, curb ramp installation will be done under force account work using the available allowances. The contractor shall be soley responsible for maintaining updated prevailing wage rate reports as issued by the State of Ohio Department of Commerce. These updates can be obtained by going to www.COM.OHIO.GOV/DICO and signing up to receive them. Registration is under the "Find Forms/Wage and Hour/Prevailing Wage" area.

Award

Sidewalks / Parking Lot

$103,234.00

Public - City

Paving, Site Work

399

15

2

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
160
Bidding Soon
2,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

Multiple Locations, Upper Arlington, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.