BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Site work for a water / sewer project in Bethune, South Carolina. Completed plans call for site work for a water / sewer project.

As of August 28, 2025, this project is out for rebid. The project consists of repairing and repainting the interior and exterior of one existing 75,000 gallon elevated storage tank. The project shall include all equipment, appurtenances, labor, materials, and other items required for a complete functioning project as included in the detailed specifications. Issuing Office is the Town of Bethune. Please contact the Town of Bethune at (843) 334-6238 for more details. Although a firm timeline has not been confirmed, construction is not expected to start prior to fourth quarter 2025. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
5
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 20, 2025

Project location map

To Be Determined, Bethune, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.