BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2025 at 8:00 PM

Updated June 25, 2025

Site work and renovation of a mixed-use development in Holden, Massachusetts. Working plans call for the renovation of a educational facility; for site work for a educational facility; and sidewalk / parking lot.

**As of June 23, 2025, bids were rejected. No definite date for the rebid.** A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following B. The project work consists of a new modular classroom connector building. The building shall be designed and constructed so as to meet all requirements of the Contract Documents, including, but not limited to, the plans and specifications for Modular Connector Building at the Dawson Elementary School on Holden, MA. 01520. General Project Information : The project will include new concrete foundations and interior ADA ramp, new wood framed and insulated exterior walls with interior gypsum board and exterior plywood type sheathing, new wood framed roof structure with insulated membrane roofing, flashings air barriers, hand rails and other required materials to complete the new connector building between the modular classrooms and the main school building. C. The work will include all operations necessary to deliver the building(s) and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the Contractor. D. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Construction of an addition to the existing modular classroom building including, but not limited to: a. Wood roof sheathing. b. Wood framing. c. Wood Wall Sheathing and air barrier. d. Concrete work. e. Carpentry, waterproofing, dampproofing, caulking. f. Roofing. g. Doors and windows. h. Interior finishes. i. Mechanical and electrical. j. Sitework and utilities work. Filed Sub-Bid Submissions Due May 15, 2025 No Later Than: 11:00AM This project work consists of an addition connecting the existing Dawson Elementary School to the existing modular classrooms building. General Project Information: The project will include new concrete foundations and interior ADA ramp, new wood framed and insulated exterior walls with interior gypsum board and exterior plywood type sheathing, new wood framed roof structure with insulated membrane roofing, flashings, air barriers, hand rails and other required materials to complete the new connector building between the modular classrooms and the main school building. Register using the form found at the link for this project, as this will ensure you automatically receive any associated addendums. Once completed, you will then be able to view the Bid results. All Bids shall be submitted accompanied by a certified check made payable to the Town of Holden or a bid bond for 5% of total price proposal as bid security. One hundred-percent (100%) Payment Bonds and Performance Bonds are required upon entering a contract with the Town, if the price proposal is greater than $150,000. The Bidder must be DCAMM Certified in General Construction Event Bid Description: Bids shall be submitted in a sealed envelope marked "Dawson Modular Connector (DPW 25-5)". The Town Manager reserves the right to reject any or all proposals and waive informalities in the bidding procedures, or to accept the proposal deemed in the best interest of the Town of Holden.

Final Planning

Educational

$150,000.00

Public - City

Renovation, Site Work

49

43

15

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
661
Active Projects
243
Bidding Soon
4,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

December 10, 2025

Project location map

155 Salisbury St, Holden, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.