Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and renovation of a mixed-use development in Holden, Massachusetts. Working plans call for the renovation of a educational facility; for site work for a educational facility; and sidewalk / parking lot.

Town Rejected all bids This project work consists of an addition connecting the existing Dawson Elementary School to the existing modular classrooms building. General Project Information: The project will include new concrete foundations and interior ADA ramp, new wood framed and insulated exterior walls with interior gypsum board and exterior plywood type sheathing, new wood framed roof structure with insulated membrane roofing, flashings, air barriers, hand rails and other required materials to complete the new connector building between the modular classrooms and the main school building. Register using the form found at the link for this project, as this will ensure you automatically receive any associated addendums. Once completed, you will then be able to view the Bid results. All Bids shall be submitted accompanied by a certified check made payable to the Town of Holden or a bid bond for 5% of total price proposal as bid security. One hundred-percent (100%) Payment Bonds and Performance Bonds are required upon entering a contract with the Town, if the price proposal is greater than $150,000. The Bidder must be DCAMM Certified in General Construction Event Bid Description: Bids shall be submitted in a sealed envelope marked "Dawson Modular Connector (DPW 25-5)". The Town Manager reserves the right to reject any or all proposals and waive informalities in the bidding procedures, or to accept the proposal deemed in the best interest of the Town of Holden. The Bidder agrees to commence work on or before the date specified in a written "Notice to Proceed" issued by the Town of Holden and to substantially complete the project no later than August 20, 2025.

Final Planning

Educational

$22,000.00

Public - City

Renovation, Site Work

25

22

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
944
Active Projects
470
Bidding Soon
6,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

December 1, 2025

Project location map

155 Salisbury St, Holden, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed