Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 17, 2025
Site work for a water / sewer project in Belzoni, Mississippi. Completed plans call for site work for a water / sewer project.
The project includes storm drain pipe replacements, catch basin replacement, tree removal, debris and sediment removal within the existing ditches along Jodie Thurman Street. The work will consist of implementing erosion control measures and a storm detention chamber installation to control runoff and to reduce flooding. The Project has an expected duration of 180 days. Project Estimate:$400,000- $420,000 Technical questions and inquiries shall be addressed to the project manager, Mauricka McKenzie, P.E. of Cornerstone Engineering, LLC in Clinton, MS at the email address of mmckenzie@cornerstoneengllc.com. The phone number is 601-473-2403. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material, and/or supply needs. Section 3 of the Housing and Urban Development Act of 1968 requires that the City and contractors participating in CDBG projects give opportunities for job training and employment to lower income residents of the Section 3 area that is described as the City of Belzoni, MS. Section 3 also requires that "to the maximum extent feasible" contracts for work in connection with Section 3 covered projects be awarded to business concerns that are located in or owned in substantial part by persons residing in the Section 3 area. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Issuing Office for the Bidding Documents is: Cornerstone Engineering, LLC 600 E. Northside Drive, Clinton, MS 39056 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$420,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
July 16, 2025
Jodie Thurman St, Belzoni, MS
Related To This Project
Belzoni, MS
--
Belzoni, MS
Bid Date: Apr 03 2025
Belzoni, MS
Bid Date: Feb 25 2025
Belzoni, MS
Bid Date: Nov 04 2024
Belzoni, MS
Bid Date: Nov 04 2024
Belzoni, MS
Bid Date: Sep 19 2024
Belzoni, MS
Bid Date: Sep 10 2024
Belzoni, MS
Bid Date: Sep 06 2024
Belzoni, MS
Bid Date: Nov 07 2024
Belzoni, MS
Bid Date: Aug 05 2024
Belzoni, MS
Bid Date: Aug 16 2024
Belzoni, MS
Bid Date: May 23 2024
Belzoni, MS
Bid Date: May 23 2024
Belzoni, MS
Bid Date: May 22 2024
Belzoni, MS
Bid Date: May 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
