Site work for a power facility in Beauval, Saskatchewan. Completed plans call for site work for a power facility.
* No bid amount to be released for publication. This project is required to maintain acceptable reliability for the ML3-AMY 72kV radial transmission line, which supplies five distribution stations from the Meadow Lake switching station. This project involved construction of approximately 64km of new 138 kV transmission line (operating at 72 kV) on an offset Right of Way (ROW) or new ROW, to replace the existing ML3 line section between Beauval Substation and Ile-a-la-Crosse Substation. The Project consists of: Two hundred and ten (210) new T61 series Self-weathering steel 138kV (operating at 72kV) structures on an offset new ROW to replace the existing ML3 line between Beauval and Ile-a-La Crosse station. Two (2) wood pole tap structures and two 72kV transformers will be installed for feeding customers. (The Work from Tap structures onwards to be done by others) Two (2) wood pole deadend structure on the existing line ML3-AMY structure 20A and ML3-ILC structure 001. Salvaging of the existing ML3-AMY wood pole transmission line. Work to be completed by others: Two wood pole structure 19A and 19B near Beavual end of the new line for interconnection to existing ML3-AMY wood pole line (to be completed by others) Replacement of 18 single wood pole structure OD to 18 (excluding CZE Breaker structure # 11) in the existing ROW near Beauval station. (To be completed by others) Three (3) T90 weathering steel structure # 228A, 2288 and 228C for interconnection to ILC substation, retermination of the conductor at ILC station (to be completed by others). Three (3) wood pole structures # ILC-OA, ILC-OB and ILC-002 for interconnection to existing ML3-ILC transmission line. (To be completed by others) Replacement of Amyot regulator and associated structures 82A to 82F. Question Acceptance Deadline: 2025/06/09 07:00:00 PM EDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Power Plant
$2,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
July 28, 2025
To Be Determined, Beauval, SK
Related To This Project
Beauval, SK
Bid Date: Sep 20 2022
Beauval, SK
Bid Date: Sep 22 2023
Beauval, SK
Bid Date: Jan 31 2023
Beauval, SK
--
Beauval, SK
Bid Date: Oct 20 2022
Prince Albert, SK
Bid Date: May 30 2025
Regina, SK
Bid Date: May 06 2025
Pangman, SK
Bid Date: May 06 2025
Saskatoon, SK
Bid Date: May 30 2025
Prince Albert, SK
--
Steelman, SK
Bid Date: May 21 2025
Saskatoon, SK
Bid Date: Jun 23 2025
Ponteix, SK
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.