Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 19, 2025 at 8:00 PM
Updated June 20, 2025
Site work for a water / sewer project in Naperville, Illinois. Completed plans call for site work for a water / sewer project.
As of May 29, 2025, this has not yet been awarded. It is slated to be presented to our Board at our June 12th Board Meeting. The scope of work includes restoration work along the shore of an ephemeral stream. Included will be removal of undergrowth plant material not including trees, minor grading, coir roll installation, seed and blanket and other miscellaneous work for a complete project as shown in the Drawings and Specifications. All questions concerning this project or those concerning bidding requirements should be directed to Peggy Motta in writing to pmotta@napervilleparks.org. Questions will be received in writing only through 12:00 PM on May 9, 2025. Requirements for Performance and Bid Bonds 1. A bid bond is not required for this project. 2. If a bid is accepted, a Labor & Material Payment Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Performance Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction on all projects $50,000 or more, and may be required for projects $50,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. 03/05/2025, 13:41 Old Farm Greenway 2025 Shoreline Restoration https://napervilleparks.org/news/OldFarmGreenway2025ShorelineRestoration 1/2 3. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program with the Owner for the prevention of substance abuse among its employees prior to the commencement of the work. Said program shall be available to the general public. Award of Contract It is anticipated that the contract will be awarded in June. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District. LIQUIDATED DAMAGES: Upon signing this contract between the Contractor and the Naperville Park District, the work to be performed will start upon the Notice to Proceed. All work shall be substantially complete 60 calendar days after the Notice to Proceed, and shall reach Final Completion not more than 75 calendar days after the Notice to Proceed
Award
Water / Sewer
$53,990.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
To Be Determined, Naperville, IL
Related To This Project
Naperville, IL
Bid Date: May 21 2025
Naperville, IL
Bid Date: May 20 2025
Naperville, IL
Bid Date: May 28 2025
Naperville, IL
Bid Date: Aug 20 2020
Naperville, IL
--
Naperville, IL
Bid Date: Jun 05 2025
Naperville, IL
Bid Date: May 29 2025
Naperville, IL
Bid Date: May 29 2025
Naperville, IL
Bid Date: May 16 2025
Naperville, IL
Bid Date: May 08 2025
Naperville, IL
Bid Date: May 05 2025
Naperville, IL
Bid Date: May 21 2025
Naperville, IL
Bid Date: May 07 2025
Naperville, IL
--
Naperville, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
