BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Renovation of a transportation facility in Des Moines, Iowa. Completed plans call for the renovation of a transportation facility.

Transition existing AFFF to F-3 for three ARFF apparatus and stock supply Expected award June 10, 2025 Submit all inquiries to Name: Clinton Torp Title: Director of Operations Phone: (515) 344-3131 E-Mail: crtorp@dsmairport.com Web: www.dsmairport.com Proposer shall be responsible to perform all work specified in this Scope of Work and as specified within the Proposer's detailed proposal as provided in Form 5. Proposer is responsible for providing all materials, containers, labor, materials, transportation, and other required services to complete the Scope of Work as specified. Proposer shall provide any and all services related to PFAS contamination cleaning of ARFF vehicles, treating, storing, and disposing of waste fluid and material, as well as collection, treatment, storage, and disposal of AFFF. Generalized tasks to be performed include mobilization and demobilization activities; rinsing ARFF vehicles to determine base contamination level; using a cleaning process to decontaminate vehicle; replacing hoses and equipment as necessary if unable to clean; coordination of pre- and post sampling of ARFF vehicles to determine when clean status is achieved; coordination of collection of AFFF; and proper treatment, storage, and disposal of AFFF and PFAS contaminated fluids and material generated through the cleaning process. Specific tasks include: The Proposer shall drain and collect the existing AFFF from the following ARFF apparatus. All draining activities must be conducted in a manner that ensures full containment and collection of AFFF to prevent environmental release. The proposal must detail the methods and equipment to be used for the collection process. The Proposer may transport the apparatus off-site to perform this work, if preferred. Labor costs will be paid by unit and AFFF disposal and provisioning will be paid by unit. Any spills that occur during the removal, handling, or transport of AFFF must be cleaned immediately and to the satisfaction of the Authority. All costs associated with spill cleanup shall be borne solely by the Proposer (quantities are approximate): ARFF 3: 210 gallons ARFF 4: 420 gallons ARFF 5: 210 gallons CH-6: 15 gallons Total Apparatus Foam: 855 gallons Questions related to this RFP may be directed to Clinton Torp, Director of Operations, on or before May 14, 2025 2:00 PM CST via email at crtorp@dsmairport.com

Award

Transportation Terminals

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
103
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2025

June 23, 2025

Project location map

5800 Fleur Dr, Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.