BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Demolition, site work, new construction and renovation of a mixed-use development in Des Moines, Iowa. Completed plans call for the demolition of a transportation facility; for the construction of a 40,000-square-foot, two-story above grade transportation facility; for site work for a transportation facility; for the renovation of a transportation facility; and water / sewer project.

construction of Des Moines Airport Terminal Project in Des Moines, Iowa. The project consists of remaining Phase 1A furniture, PBB install, and Admin Building general package; and Phase 1B East site improvements and construction of a new 40,000 square foot two story building. The project is located at: Des Moines Airport 5800 Fleur Drive Des Moines, IA 50321 Preapproval Forms are only being accepted for the work scope packages listed below: BP 103D - Precast Material Supply BP 105A - Structural Steel Material, Steel & Precast Install BP 107A - Roofing BP 108B - Exterior/Interior Glazing Systems, Aluminum Entrances BP 108C - Overhead Doors BP 109A - Exterior/Interior Stud Framing, Gyp Assemblies BP 109B - Exterior/Interior Painting BP 109C - Tiling Walls & Flooring BP 109D - Flooring BP 109E - Terrazzo Flooring BP 109F - Fluid Applied Floorings & Concrete Sealants BP 110C - Signage BP 111B - Kitchen Equipment BP 114A - Elevators, Escalators BP 121A - Fire Suppression, Sprinklers BP 123B - Mechanical, Plumbing BP 126B - Electrical, Comm, Low Voltage , FA, Lighting BP 131C - Civil 2026 - Site Grading, Site Utilities, Landscaping, RAPS BP 134B - Passenger Boarding Bridges Supply BP 134C - Passenger Boarding Bridges Install BP 012B - Furniture, Furnishings BP 034C - PBB Install (1A, 1B West) Contact LuAnne Nielsen at LuAnne.Nielsen@weitzturner.com by no later than 3:00 PM May 20, 2025 to request virtual access to the Informational Session.

Post-Bid

Transportation Terminals

$4,000,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
101
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

5800 Fleur Dr, Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.