Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
Site work and paving for a mixed-use development in Freeport, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 29, 2025, at 1:30 PM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for the preparation of a project report (anticipated to be a categorical exclusion) and Phase II contract plans for the reconstruction of IL 26 from US 20 BR to Empire Street in Freeport, which is approximately 1.0 mile in length. The proposed improvements include widening to a 3-lane section, multi-use path to accommodate bicycles per Complete Streets Policy, sidewalk improvements with ADA/PROWAG compliant designs, hydraulic surveys and analyses, location drainage study (LDS), intersection improvements, storm sewer, proposed ROW documents, identify utility conflicts and possible relocations and S.U.E. survey work, coordination with resource agencies and preparation of cost estimates. It is anticipated that public involvement meetings may be necessary, and it could be Virtual or InPerson. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed The method of contractor selection has not been determined at this time. IL DOT - 29 - RFQ Engineering - IL 26 from US 20 BR in Freeport, Roadway Reconstruction, Phase I/II Engineering Services *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$14,700,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2026
IL-26, Freeport, IL
Related To This Project
Freeport, IL
Bid Date: Jun 13 2025
Freeport, IL
Bid Date: May 27 2025
Freeport, IL
Bid Date: Jun 06 2025
Freeport, IL
Bid Date: May 30 2025
Freeport, IL
--
Freeport, IL
--
Freeport, IL
Bid Date: Jun 13 2025
Freeport, IL
Bid Date: Jun 06 2025
Freeport, IL
Bid Date: May 13 2025
Freeport, IL
Bid Date: May 13 2025
Freeport, IL
Bid Date: May 06 2025
Freeport, IL
Bid Date: Apr 29 2025
Freeport, IL
Bid Date: May 01 2025
Freeport, IL
Bid Date: Apr 10 2025
Freeport, IL
Bid Date: Apr 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
