BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Bloomington, Illinois. Contact the soliciting agency for additional information.

This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2025, at 10:00 AM at the Region Three/District Five in Champaign. Phase III engineering services are required to provide construct inspection for the 3P Policy, Designed Overlay, ADA Improvements, Traffic Improvements and Traffic Signal Modernization on Rte. 9 in Bloomington. The Consultant's work includes, but is not limited to, providing up to four qualified individuals, vehicles, tools, and appropriate test equipment necessary to assist in performing the required inspection and other duties to allow the timely completion of this project in accordance with state specifications. These tools will include an office computer system capable of running CMMS software. The Consultant will perform on-site inspection, layout including design changes, provide construction layout when not provided for in the contract plans, provide geotechnical and nuclear inspection and testing, prepare records, maintain documentation, submit pay estimates, change orders and any other duties that would require the services of an engineer to complete this project on a timely basis and in accordance with state specifications. Inspection includes, but is not limited to, minor excavation, storm sewer and inlets, casting adjustment, curb and gutter, sidewalk, traffic signals, and other items associated with HMA standard overlay. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The anticipated construction completion date is September 30, 2029 The method of contractor selection has not been determined at this time. IL DOT - 41- RFQ - Rte. 9 From I-74 to Royal Pointe Dr. in Bloomington, Phase III Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
65
Bidding Soon
1,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

IL-9, Bloomington, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.