BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Effingham, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 16, 2025, at 10:00 AM at the Region Four/District Seven Office in Effingham. Phase I/II engineering services are required for various projects on various routes throughout District Seven. Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, hydraulic analysis, geometric studies, preparing bridge condition reports, performing location studies, and preparing project reports (categorical exclusion projects only). This work will include data collection, development of alignment alternatives, cost estimates, traffic management analysis, accident analysis, TS&L structure plans, and other related work and exhibits necessary to produce the Project Report, as necessary. Phase II work, if required, may consist of conducting route surveys, hydraulic reports, traffic signal plans, preparation of TS&L plans, roadway plans, structure plans, ADA plans, and any other related work to complete final plans, specifications, and estimates, as necessary. The various proposed projects may consist of simple patching and resurfacing, widening and resurfacing, ADA ramps, and/or pavement replacement projects; structure repair, structure rehabilitation, and/or structure replacement projects. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed. The method of contractor selection has not been determined at this time. IL DOT - 44- RFQ - Various Phase I/II Projects, Various Routes, Various Counties, Region Four/District Seven

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

Multiple Locations, Effingham, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.