BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Troy, Illinois. Contact the soliciting agency for additional information.

This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 23, 2025, at 1:30 PM at the Region Five/District 8 Office in Collinsville. Phase I/II engineering services are required for the preparation of a Project Report (anticipated to be a Categorical Exclusion) and final contract plans, specifications, and estimates for the replacement of the structures carrying I-55/70 over Keebler Rd. Phase I work is anticipated to include the preparation of a Project Report, environmental studies and coordination, TS&L drawings, Structure Geotechnical Report (SGR), Location Drainage Study, geometric studies, soil borings, supplemental surveys, public involvement using Context Sensitive Solutions, Traffic Management Plan, and all other work necessary to complete Phase I and obtain Design Approval. Phase II engineering services required for this project include the preparation of all Plans, Specifications and Estimates (PS&E) documents. Additional items include, but are not limited to, participating in local agency and/or public coordination, preparing detailed staging and traffic control plans, geometric modifications, drainage plans, storm water pollution prevention plan, roadway geotechnical report, supplemental surveys, reviewing shop drawings and all other necessary related work to complete Phase II. Phase II work will be included in a planned supplement. The following structures are included in this project: S.N. 060-0016: I-55/70 (EB) over Keebler Rd S.N. 060-0017: I-55/70 (WB) over Keebler Rd Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 72 months after authorization to proceed. The method of contractor selection has not been determined at this time. IL DOT - 47- RFQ - I-55/70 over Keebler Road, Phase I/II Engineering Services, Collinsville, Madison County

Conceptual

Roads / Highways

$24,700,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
98
Bidding Soon
1,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

I-70 & I-55, Troy, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.