BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Greeneville, Tennessee. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Town of Greeneville invites qualified contractors to submit proposals for the construction of a new pocket park located in downtown Greeneville, in an area known as Eagle's Rest Pocket Park. The project will implement an existing design to create a functional, attractive, and accessible green space aesthetically pleasing that connects Main Street to the Crowfoot Alley parking lot. Questions must be submitted in writing by Friday, May 2, 2025 by 5:00 pm to Dave Wright, Architect P.O. Box 1104 Greeneville, TN 37744. All questions and answers will be shared with all known bidders The pocket park will serve as a community asset and pedestrian connector. The scope of the project includes site preparation, a concrete pathway, landscaping, site furnishings and utility infrastructure. The design documents, including plans and specifications, will be provided upon request and/or with issuance of this RFP Site Preparation and Pathway Construction o Clear and grade the site per the design documents o Install a concrete pedestrian pathway from Main Street to the Crowfoot Alley parking lot o Install concrete slab for food truck parking o Any necessary structural support or retaining features Structural Elements o Construct any retaining walls, foundations, removable bollards, or structural elements as specified in the drawings o Install entryway steel arch Utility Installation o Electrical- provide service for site lighting, including conduits, wiring, and fixture installation and potential future needs (food trucks, sound/stage) o Plumbing- install outdoor faucets or spigot connections per plans for easy access to water for irrigation of landscaping needs and future water features. Landscaping and Hardscaping o Planting of trees, shrubs, plants and installation of sod/grass per landscaping specifications o Pathway surfacing, pavers, edging, and any other decorative hard elements included in the design Site Furnishings o Provide and install benches, seating, and other amenities outlined in the documents

Award

Playgrounds / Parks / Athletic Fields

$175,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

13

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
63
Bidding Soon
1,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 2, 2025

Project location map

116 S Main St, Greeneville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.