BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, new construction and addition to a fire / police facility in League City, Texas. Design plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.

This fire station will be a sub-station that will have three drive-through bays, for an ambulance, an engine, and future buildout needs. The station will have a minimum of 8 dormitory rooms for Fire and EMS personnel, which includes 3 bathrooms with showers, a common area, as well as offices for a Fire Engine Supervisor, future District Chief, and a secured office with a murphy bed for a Police Officer. The Engine Supervisor, Chief, and Officer will share a bathroom. In addition, this request is to also add diesel exhaust removal systems for all station bays, bi-fold doors for the front bays, and large bay fans for air circulation. A fire engine and ambulance are reflected in the FF&E. **Design and construction is contingent upon having a buildable site, which includes roads and utilities, in the Lloyd Tract.** FY2025 ($2.25M) Design - $900,000 Utilities Design/Utility Relocate based on selected site - $900,000 Land Acquisition - $450,000 FY2027 ($15.65M) Construction - $10,700,000 Access/Utilities - $3,000,000 -(estimated between $500k - $6M) **Budget reflected at $3M** FF&E - $1,950,00 The project is included in the City's 2026-2029 Capital Improvement Program (CIP). As of April 14,2026, information regarding design firm, construction manager, and general contractor has not been released. Further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Fire / Police

$17,900,000.00

Public - City

Addition, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
248
Bidding Soon
3,649
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

To Be Determined, League City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.