BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Renovation of a mixed-use development in Stockton, Illinois. Completed plans call for the renovation of a educational facility.

Install 11 exterior doors in the elementary school and high school. Contact us for required doors, frames, and hardware Project is to be completed in the middle to the end of July. The expectation is to work with the company removing the doors and asbestos abatement for installation. The following are bid requirements Submit bid for the total cost of the project. Must provide written proof of insurance with bid as well as workman's compensation insurance

Award

Educational

$168,750.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
96
Bidding Soon
1,221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 6, 2025

Project location map

Multiple Locations, Stockton, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.