Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
Site work for a playground / park / athletic field in Oshkosh, Wisconsin. Completed plans call for site work for a playground / park / athletic field.
The owner has selected a Design/Builder, but the constrction start date was not yet been established. ALL PROSPECTIVE BIDDERS/RESPONDENTS ARE HEREBY CAUTIONED NOT TO CONTACT ANY MEMBER OF THE CITY OF OSHKOSH STAFF OR OFFICIALS OTHER THAN THE SPECIFIED CONTACT PERSON. M/WBE's are encouraged to participate in the bid process. A. Pickart Park Background The City is seeking proposals for modular playground equipment designs and installation for Pickart Park located at 735 Pauls Place, Oshkosh, WI 54904. The City will be responsible for excavating the equipment site, placing dense base coarse stone, and installing necessary drain tile. The City will restore the site, including finished grading and seeding, upon completion of project. The maximum budget for the Pickart Park project (including the total costs of design, install, 4' wide concrete perimeter walk with three (3) bump outs for benches, 5' wide concrete walkway connecting to where the public sidewalk will be installed by the developer, pouredin-place rubber surfacing and installation) is $250,000.00. A maximum of three proposals/designs for Pickart Park may be submitted per Proposer. B. Pickart Park Modular Playground Equipment Design Specifications o All proposals shall be fully compliant with the most current CPSC guidelines, ASTM standards and IPEMA certification. All equipment shall be compliant with the full intent of all ADA guidelines for accessibility, play components and design; o All play structures shall be constructed of steel or aluminum posts, with PVC coated steps, including all transfer points and decks. Wood shall not be permitted. Use of recycled materials is permitted; o All play structure pipe measurements must be a minimum of 3.5"; o All proposals should take into account that the new equipment will replace existing equipment and must be confined to an area no greater than approximately 60'X60' fall zone footprint and the play area surfacing shall extend a minimum of 6' from the nearest playground equipment; o All proposals should provide for youth 2-12 year olds; o The following components/features MUST BE INCLUDED within each proposal design: - Multi-generational swing - Belt and bucket swings (2 bay swing set) - Provide color charts for all equipment - Ensure all components fit in approximate 60'X60' fall zone; o The following components SHALL NOT BE INCLUDED in any proposal design: - Roofs, canopies or tunnels; o Poured-in-place rubber surfacing is required under and around all playground equipment. The thickness of the surfacing is based on the fall heights of the nearby equipment. Proposals should include cost estimate for a 50% color and 50% black surface. The surfacing must include all proper drainage bases, final grading and stone as required and must have a comprehensive warranty. Final grade must have positive drainage to the northwest corner of the project site. o Proposals must include all warranty coverage information including both moving and non-moving components. Proposals must provide comparisons between full and limited/pro-rated warranties. Question Deadline: 05/16/2025 at 4:30 PM CT All questions regarding this RFP must be submitted via email to: Jon Urben, General Services Manager, City of Oshkosh Email: jurben@oshkoshwi.gov
Award
Playgrounds / Parks / Athletic Fields
$250,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
June 30, 2025
735 Pauls Pl, Oshkosh, WI
Related To This Project
Oshkosh, WI
Bid Date: Aug 07 2020
Oshkosh, WI
Bid Date: Apr 30 2019
Oshkosh, WI
--
Oshkosh, WI
--
Oshkosh, WI
--
Oshkosh, WI
--
2025 Tennis Court/Pickleball/Basketball Court Rehabilitation 44th Parallel & Stevens Parks - 5786969
Oshkosh, WI
Bid Date: Jun 03 2025
Oshkosh, WI
Bid Date: Jun 02 2025
Oshkosh, WI
Bid Date: Apr 24 2019
Oshkosh, WI
Bid Date: May 19 2025
Oshkosh, WI
Bid Date: May 21 2025
Oshkosh, WI
Bid Date: May 20 2025
Oshkosh, WI
Bid Date: May 20 2025
Oshkosh, WI
Bid Date: Apr 28 2025
Oshkosh, WI
Bid Date: May 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
