Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated September 30, 2025
Site work for a mixed-use development in Wolfforth, Texas. Completed plans call for site work for a municipal facility; and water / sewer project.
Question Submission Deadline: May 23, 2025, 12:00pm Questions are to be submitted using the Question and Answer process on the Procurement Website. Responses to questions posted on the Procurement Website will be posted on the Procurement Website by the Owner for the benefit of all prospective Respondents. A response will be posted for questions submitted The Tarrant Regional Water District (Owner) (TRWD) is requesting Letters of Interest (LOI) for contractors experienced in constructed wetlands, intake and booster pump stations, and large diameter water pipeline to collaborate in a constructability discussion related to several upcoming pipeline replacement projects as well as projects within the Marty Leonard Wetland (MLWL) Program. Pre-Proposal Meeting (Non-Mandatory): https://nam04.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_MDFhZGNkYTMtNGZlNS00NTc1LWIzZjctZGQ4ODM4MTVjOWY5%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522c9de0af1-361b-42ae-ace3-ab4cea6cb8dc%2522%252c%2522Oid%2522%253a%2522cf9e3c28-8eef-44ef-920b-f6eb5fbce092%2522%257d&data=05%7C02%7CAudrey.Reed%40trwd.com%7C0cdfde0be2934e2642d708dd881d3754%7Cc9de0af1361b42aeace3ab4cea6cb8dc%7C0%7C0%7C638816381237242172%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=xK1Fi1fhEo8ozkuvTIsc2%2Fvjjtzl2FP34%2BGoRXZH%2BFk%3D&reserved=0 Cedar Creek Section 2 Phase 2 Pipeline Replacement project This project will remove approximately 4.42 miles of 72-inch pre-stressed concrete cylinder pipe and replace with 102-inch mortar-lined welded steel pipe from near the Kennedale Balancing Reservoir to near Mouser Way at US Hwy 287 in Tarrant County, Texas. The existing water pipeline easement at Section 2 is 130 feet wide with the existing 72-inch pipeline located 40 feet from the north easement line. Within the same easement is the 90-inch Richland Chambers (RC) pipeline 35 feet south of the Cedar Creek Pipeline. The RC pipeline will require protection during construction.
Post-Bid
Water / Sewer
$410,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
Multiple Locations, Wolfforth, TX
Related To This Project
Wolfforth, TX
Bid Date: Oct 28 2025
Wolfforth, TX
Bid Date: Oct 15 2025
Wolfforth, TX
Bid Date: Dec 04 2025
Wolfforth, TX
--
Wolfforth, TX
--
Wolfforth, TX
Bid Date: Mar 05 2025
Wolfforth, TX
--
Wolfforth, TX
Bid Date: Dec 03 2024
Wolfforth, TX
Bid Date: Oct 29 2024
Wolfforth, TX
Bid Date: Sep 30 2024
Wolfforth, TX
Bid Date: Jul 24 2024
Wolfforth, TX
--
Wolfforth, TX
Bid Date: Feb 06 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
