BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work and renovation of a civil project in Brimfield Township, Ohio. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Brimfield Water Treatment Plant Water Well . The Contractor shall provide all labor, material, and equipment necessary to drill a new water well, install the casing, screen, gravel pack, grout and well cap and perform all pumping tests necessary to size a future production well at the Brimfield Water Treatment Plant. The well shall be 24 inches in diameter and approximately 115 feet deep with 40 feet of screen. The Contractor shall familiarize himself with all of Section 20, including 'Information and Instructions to Bidders' and 'Special Construction Requirements' prior to bidding. All bids must be submitted on the bid forms included in the Contract Documents and returned with the bid book in its entirety. The Bid Guarantee is conditioned to provide that if the Bid is accepted and awarded, the Bidder will enter into a contract with the County and will file a Performance Bond as required. The Bidder to whom the Contract is awarded will be required to furnish a Performance Bond in the sum of 100 percent of the Contract price for the faithful performance of the Contract. If the Bidder selects "Bid Guarantee" Option A, the Bidder may use this Bond as the Performance Bond. Each Proposal must contain the full name of the party or parties submitting the documentation and all persons interested therein. Each Bidder must submit evidence of its experiences on projects of similar size and complexity. The bidder shall purchase the plans and a contract book to become a qualified participant before final bid submittal. All questions shall be directed to the Portage County Water Resources Department in writing to jvence@portageco.com. The Owner intends and requires that the project be completed in about 10 months or three-hundred and four (304) calendar days after the "Notice to Proceed" is issued and complete restoration within thirty (30) days thereafter.

Bid Results

Water / Sewer

$375,593.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
10
Bidding Soon
1,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

To Be Determined, Brimfield Township, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.