Site work and renovation of a water / sewer project in Sugar Land, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Sugar Creek Water Plant: For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor will be responsible for preparing the , which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as . The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final grading to ensure the is properly prepared and completed according to specifications. Additionally, final grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls). First Colony Water Plant: For First Colony Water Plant, the scope of work includes the rehabilitation of the existing Automatic Transfer Switch (ATS) and the installation of a new diesel generator, sub-base fuel tank along with a proposed dual-purpose docking station. The contractor will be responsible for preparing the , which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as . Additionally, final grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals to complete the work as specified. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final grading to ensure the is properly prepared and completed according to specifications. Additionally, final grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals to complete the work as specified. SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls). Miscellaneous Improvements: The miscellaneous improvements include the following items: Installation of New Diesel Fuel Management Systems Rust Prevention, Painting, and Protective Coatings Repairs to existing Fuel Storage Tanks. Before commencing any miscellaneous improvement tasks, a visit should be conducted at each facility to verify the scope of work. Existing conditions may differ from those when the project scope was initially developed. This visit will be coordinated with the Owner's designated representative to assess the and confirm the feasibility of the proposed improvements. The objectives of the visit include: Verifying the physical space and layout. Ensuring all necessary infrastructure and utilities are available. Identifying potential challenges that may arise during installation. Discussing any modifications or special considerations for the initial design or installation plan. Question Deadline 12/04/2025 at 5:00 PM CT Please submit written s to Gurwinder S. Aulakh, P.E. via the and answer section in online. The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within sixty (60) calendar after the opening date and time. PERFORMANCE AND PAYMENT BONDS. The successful Bidder furnish Performance and Payment Bonds in the amount of 100% of the Contract Price executed by a Surety authorized to do business in the State of Texas and meeting the other requirements of Chapter 3503, Tex. Insurance Code. The successful Bidder furnish Performance and Payment Bonds within ten (10) of the City of Sugar Land City Council's award of the Contract. The cost of the Performance and Payment Bonds be included in the Contract Price. 1950 First Colony Blvd, Sugar Land, TX, 77479 2030 Country Club Blvd, Sugar Land, TX, 77478 Multiple Other Locations For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. The City may reject any or all Bids as provided by law. Project ID - 2026-ITB-004
Bid Results
Water / Sewer
$1,120,650.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2025
January 19, 2026
Multiple Locations, Sugar Land, TX
Related To This Project
Sugar Land, TX
Bid Date: Sep 04 2025
Sugar Land, TX
--
Sugar Land, TX
--
Sugar Land, TX
Bid Date: Jun 06 2025
Sugar Land, TX
Bid Date: Jun 12 2025
Sugar Land, TX
Bid Date: Jun 12 2025
Sugar Land, TX
--
Sugar Land, TX
--
Sugar Land, TX
--
Sugar Land, TX
Bid Date: May 22 2025
Sugar Land, TX
Bid Date: May 09 2025
Sugar Land, TX
Bid Date: May 09 2025
Sugar Land, TX
Bid Date: Jun 11 2025
Sugar Land, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.