BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a civil project in Foster Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The scope of the project includes making drainage improvements, road surface preparation and roadway construction with 4-inch Minus Stone. Questions concerning project specifications and requirements should be directed to Foster Schaffer in the PGC Engineering Division at 717-787-4250, ext. 73322. Any questions concerning completion of an electronic bid should be directed to the PGC Procurements Division at 717-787-6594. Duration: Upon Award through 10/3/25. the Commonwealth reserves the right to reject any and all bids, to waive technical defects in bids and to accept or reject any part of the bid deemed in the best interests of the Commonwealth. Except as otherwise provided by law, award will be made to the lowest responsible and responsive bidder, and all bidders will be advised of the bid results. A Purchase Order will be generated at the time of award without further input from the successful bidder. Awarded vendor will be sent a copy of this document and no work will be authorized until the vendor is in receipt of the Purchase Order. The Contract shall commence upon delivery of Purchase Order to Contractor (estimated to be July 1, 2025) and shall terminate on October 3, 2025. This project involves the maintenance of a 22,586-feet (4.28-miles) long section of Hollenback Road and a 1,810-feet (0.34-miles) long section of a spur road on State Game Lands (SGL) #119. The project includes clearing the road corridor, grading, pipe installation, road base construction and related work. Work Area- SGL #119 is located in southeastern Luzerne County. The east end of the project (Sta. 102+92) is located at the intersection with another PGC in the central part of the state game lands. The road project stretches west and ends at the intersection (Sta. 328+78) with a paved public road (Tunnel Road - County Road 19). Most of the project is in Dennison Township but there are short portions of the project in Fairview Township. The site is owned by the Pennsylvania Game Commission (PGC). Most new drainage pipes are 15-inch diameter corrugated plastic 30-feet long. There are two pipes that are 24-inch diameter and one pipe that is 36-inch diameter. Precast concrete headwalls are to be placed on the upstream and downstream ends ofthe new pipes. Place riprap splash pads on the downstream ends ofthe new pipes.

Bid Results

Roads / Highways

$713,267.00

Public - State/Provincial

Paving, Site Work

6

9

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
246
Bidding Soon
2,516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 1, 2025

Project location map

Hollenback Rd, Foster Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.