BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and renovation of a civil project in Foster Township, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Construction of under slab and interior exposed building drains, floor drains, drain/waste and vent piping in the water treatment plant building. Drainage work shall terminate 5 feet from the building foundation exterior and construction of under slab and interior exposed potable water hot and cold water plumbing and piping. Includes hot water heater, emergency eyewash unit, stainless steel utility sink, backflow preventer system and related appurtenances and as shown on the construction drawings and as specified along with all requirements to make the system 100% functional and code compliant. This project is located at Exit 262, I-80 Eastbound, Foster Township, Luzerne County PA 18661. Project Cost Range: $100,000.00 - $199,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: Optional Anticipated NTP: 07/07/2025 Wage Rates: Yes Required Completion: 01/05/2026 Prequalification Requirement: No State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PADOT: A251-1100 Luzerne co RSR 39 Water Treat Facil-Plumn This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room. All project questions during bidding will be handled through ECMS. Contractors will submit questions to ECMS and the Design Professional and PennDOT will respond to questions via ECMS. Direct any questions regarding the pre-bid conference location and time to CPA John Kieffer at (717)-480-0104. All technical and specific questions must be asked through ECMS ONL

Award

Water / Sewer

$186,652.00

Public - State/Provincial

Renovation, Site Work

92

29

57

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
227
Bidding Soon
2,806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

July 7, 2025

Project location map

I-80, Foster Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.