Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Demolition, site work, renovation and addition to a medical facility in Toledo, Ohio. Completed plans call for the addition of a 2,498-square-foot medical facility; for the demolition of a medical facility; for the renovation of a medical facility; and for site work for a medical facility.
Umc Cardiac Cath Lab 4 This Project Involves Renovations to the First Floor of the University of Toledo Medical Center, Including the Addition of a New 2,498 Sf Cath. Lab Procedure and a 2,278 Sf Prep/recovery Suite to Support Cardiovascular Procedures Questions Must Be Received Through Online. Questions Received by Phone, via Email, or Otherwise, Will Not Be Answered. Question Deadline 05/20/2025 at 2:00 Pm Et Milestone Dates Are Defined in Calendar Days Following the Date Set Forth in the Notice to Proceed and Are Required to Be Met by the Contractor. Time is of the Essence for the Completion of Milestones, Substantial Completion Date, and for the Contract Completion Date. 2. the Following Milestone Dates Are Defined in Calendar Days From the Notice to Proceed, With the Exception of Substantial Completion and Contract Completion, and Shall Be Adhered to by the Contractor: A. Milestone M1 - Phase 1 Construction: Prep / Recovery 150 Consecutive Days From the Commencement Date in the Notice to Proceed B. Milestone M2 & Substantial Completion of All Work - Phase 2 & 2a Construction: Cath Lab 4 and Support Areas 347 Consecutive Days From the Commencement Date in the Notice to Proceed C. Additional Pm Time for Equipment Installation and Testing Oversight 370 Consecutive Days From the Commencement Date in the Notice to Proceed 3. the Following is an Anticipated Schedule of Construction for Planning Purposes Only. The Contractually Obligated Milestone and Contract Completion Dates Are Defined in Calendar Days From the Notice to Proceed, With the Exception of Substantial Completion and Contract Completion, and Shall Be Adhered to by the Contractor. It is Required That Contractor Will Be Present and Available During Move-in and Equipment Installation Periods.: Phase 1 Construction: Prep / Recovery - 150 Calendar Days Owner Move - 7 Calendar Days Phase 2 & 2a Construction: Cath Lab 4 and Support Areas - 190 Days Cath Lab Equipment Installation - 23 Days Cath Lab Applications & Testing - 14 Days - Contractor Does Not Need to Be Present The Bidder Commits to Meet or Exceed the Advertised Edge Participation Goal of the Contract Award Amount, Calculated as a Portion of the Base Bid Plus All Accepted Alternates, by Using Edge-certified Business(Es). Edge Participation Goal for This Project is Not Less Than 5% of the Contract Sum With Edge-certified Business(Es).
Award
Medical
$1,599,900.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.